An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

15 June 2026

Horizons Montessori School, Dublin 6W · Regulation 29 — Premises

Provider's corrective action:
  • (d)(e) The registered provider stated that children's sanitary areas are currently being refitted with additional and replacement toilets, sinks and surrounds. There will seven toilets and sinks available to children on completion of the works and going forward we will aim to complete necessary building works in a timely manner

15 June 2026

Ringsend Creche Ltd, Dublin 4 · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The outdoor area is now clear of rubbish and debris. Staff were reminded to ensure they complete the outdoor risk checks which will be reviewed by management. 2. The service report that the door was repaired and is now closing effectively. This will be monitored. 3. Management report the walls have been sanded and will ensure monthly inspection will be carried out on walls, skirtings and window sills. 4. Management report the sills have been painted and will ensure monthly inspection will be carried out on walls, skirtings and window sills. 5. The management company of the building were informed of this issue, and evidence was submitted that a pest control company has been engaged. The service report they will fit light fittings with insect proof seals and the pest control company check will now monitor for and prevent pest entry. 6. Management report the ventilation unit was cleaned and will ensure weekly inspection will be carried out. 7. Management report the radiators have been sanded, painted and treated and will ensure monthly inspection will be carried out. (e) Thermostatic Mixing Valve connected to the wash and hand basin in Toddler 2 room was adjusted and recalibrated to restrict the maximum hot water output. The service will ensure the water is checked by staff

10 June 2026

Little Scholars, Dublin 12 · Regulation 29 — Premises

Provider's corrective action:
  • Following the inspection, a painter attended the service to assess the required work and commence preparatory repairs. The painter is scheduled to return on 20 July 2026 to fill all remaining holes and complete the repainting of the entire setting. This work will ensure that the premises are maintained in a good state of repair, are clean and well maintained, and continue to provide a safe, suitable, and welcoming environment for children. The person in charge will continue to monitor the condition of the premises through daily environmental checks, regular health and safety inspections, and ongoing risk assessments. Any maintenance issues identified will be recorded, prioritised, and addressed promptly to ensure the environment remains safe, clean, and well maintained. A planned maintenance schedule will also be maintained to support the timely completion of repairs and to ensure continued compliance with regulatory requirements

3 June 2026

Isabella's Childcare, Dublin 9 · Regulation 29 — Premises

Provider's corrective action:
  • A mechanical ventilation system was fitted in the room

26 May 2026

The Village Creche, Portmarnock · Regulation 29 — Premises

Provider's corrective action:
  • (d) • Wash hand basins are now repaired. Landlord to replace during the summer months. • Cable tie has been removed to the tap is back in working order. Management will check the taps each morning to ensure they are in working order

21 May 2026

Little Sparrows Early Years Preschool Service, Dublin 15 · Regulation 29 — Premises

Provider's corrective action:
  • Management have spoken with building management, and they have confirmed that the vines will be cut down. Management will liaise with building management to keep on top of maintenance

19 May 2026

Darndale/Belcamp Integrated Childcare Service Ltd., Dublin 17 · Regulation 29 — Premises

Provider's corrective action:
  • (c) The air vent of the mechanical ventilation in Honeybees required cleaning for it to work correctly. This was completed. (d) A new part was put onto the tap by the maintenance team to ensure the tap was easier to turn on for the children. The air vents and taps will be monitored by adding them to the daily health and safety list, to ensure that they remain in working order

14 May 2026

Fitzkinder Day Nursery and Montessori School, Dublin 2 · Regulation 29 — Premises

Provider's corrective action:
  • (d) • The metal bar was removed and all the area cleaned. A section of plastic was fitted to protect any risk it can be there for the children’s safety. • The damaged radiator cover was removed and replaced. This needs to be painted. • All the vents in the Montessori area and the rest of the creche were clean. • The floor for Montessori including the floor edges were cleaned. • The cot room was clean to protect the children’s safety and health. • Montessori class will be painted the weekend of July 18th. • We fix it the damage skirting board in the Montessori Class and this will be painted the weekend of July 18th. The room assessment and risk assessment have bee updated to check for dust and damage daily

13 May 2026

Sharavogue School, Glenageary · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. An imme diate review of the outdoor garden was conducted. The damaged panels separating the play areas have been identified for replacement and any loose panels will be securely fixed and damaged areas replaced where necessary. All exposed and splintered wood will be repaired and repainted where needed. The outdoor area will continue to undergo daily risk assessments to identify any further damaged fencing, panels or wooden areas. 2. The wooden picnic table will be removed and replaced with a new one . Materials have been delivered and maintenance have scheduled plans for building a new table. To prevent this from happening again staff have been asked to notify the compliance manager if there are any repairs needed when carrying out risk assessments in the garden. Any repairs noted will be but in the handyman’s book for prompt attention. 3. The damaged fire assembly has been repaired and the gap at the base has been eliminated to eliminate the safety risk. The outdoor area will be inspected to ensure all hazards are removed. To prevent this from happening again any maintenance issues identified will be addressed promptly

13 May 2026

St. Nicholas Montessori Merrion, Dublin 4 · Regulation 29 — Premises

Provider's corrective action:
  • The are registered providers stated that 1 & 2 - The items noted in points 1 and 2 were removed except for the playhouse which will be renovated over the summer. New outdoor play equipment was ordered. 3 & 4 - The school is painted each year over the summer holidays and all chips in wood will be repaired when the painting work is complete. Going forward the painter will be brought in during a break in the school year to ensure the building is maintained when needed

11 May 2026

Woodlands Crèche & Montessori, Lusk · Regulation 29 — Premises

Provider's corrective action:
  • • Toilet seat has been replaced, and water damaged area has been treated and painted. • Exposed plaster board beside windows has been fixed and painted. More regular maintenance checks will be completed on the premises

7 May 2026

Family Resource Centre Ltd, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. Wall tile is still missing service is currently sourcing a tiler to replace in short term a laminated piece of paper has been placed over the missing tile until a tiler can fix this. 2. A cleaning company was brought in to carry out a deep clean of the whole service. The floors have been professional cleaned. Staff are aware of the need to sweep and clean the floor daily and cleaner will ensure the rooms are mopped each evening to maintain the cleanliness. 3. All windows have been professional cleaned images attached. Window cleaning sprays have been added to each room to ensure these are maintained. 4. Outdoor area has been power hosed and weeds/bushes cut back and removed. 5. Slide has been removed and new play equipment has been added. 6. Picnic table has been disposed of. 7. Armchair has been removed and disposed of. 8. Chalk board has been removed from wall. Management and Registered Provider will ensure checks are carried out on the building to prevent weeds/dirt/damage. Risk assessment checks will be carried out regularly by staff and management and any issues will be reported and rectified immediately going forward

28 April 2026

Bright Futures Creche, Dublin 15 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) Management booked a handyman to carry out maintenance jobs for August when the Creche is closed for 1 week. Preventive Action (d) Management plan to hire a handyman to work weekends or evenings

28 April 2026

YMCA Childcare, Dublin 2 · Regulation 29 — Premises

Provider's corrective action:
  • (d) In response to the non-compliances the service has stated the following. • Affected areas cordoned off as interim measure until construction works begin. • A contractor has been booked for works week of 7th September. • Flaking plaster repaired

23 April 2026

The Village Day Care & Montessori School Ltd, Dublin 22 · Regulation 29 — Premises

Provider's corrective action:
  • 1. All the skirting boards radiator covers and window sills have been freshly painted and the rooms have had a deep clean. The manager will review rooms on a monthly basis. 2. The service engaged a painter who treated this area and painted the entire ceiling. The manager will review rooms monthly and will organise maintenance where required. 3. Toilets seats are replaced. The manager will inspect toilets as part of their daily morning inspection risk assessment. 4. The sink is now secure. The manager will check toilets as part of the daily morning inspection. 5. The play house has been replaced with a heavy-duty plastic playhouse and the manager will inform the owner when items need to be replaced. 6. The lino has been replaced in Montessori room 1 with a wooden floor. Due to finances the Toddler room floor was not replaced but it was given a deep clean. The three toy units were replaced the service intends to replace this floor in October or sooner if finances allow. The owner will take monthly inspections of the rooms and premises. 7. Dolls houses have been replaced. This was discussed at the staff meeting regarding the risk assessment. 8. The cord has been fixed. This was discussed as part of the risk assessment checklist. 9. The lock on the gate has been repaired. Staff have been made aware the staff meeting if they see anything in the back garden that would be a risk to the children’s safety the staff sign an outdoor checklist

16 April 2026

Little Rainbows (Parkside Belmayne), Dublin 13 · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. In response to the non-compliances the registered provider has stated that the tap was fixed and has been included in the daily risk assessment

8 April 2026

Bright Minds Childcare and Montessori School Ltd, Dublin 16 · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider has stated: 1. The gap between the outside building and the ground surface has been temporally filled with sand. The outdoor area will be landscaped in July. This gap will be filled with a pipe, and a grate will be laid on top. 2. The garden will be resurfaced in July; this will include laying grass on the ground instead of paving slabs. 3. The ramp has been covered by an anti-slip tape surface; this will be maintained to ensure it is not a tripping hazard. 4. The track for the sliding door was cleaned to ensure the door opens and closes easily; a company has been appointed to replace the door. 5. The shelves in the Montessori room have been sanded and repainted. The service will carry out regular checked to ensure the shelves are maintained. 6. New tables have been ordered for the Montessori room, these tables will be monitored and maintained

30 March 2026

Doras Buí, Dublin 17 · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. Loose taps fixed and unfinished surface at back of one toilet in the sanitary facility was repaired and painted by maintenance man. Discussion at staff meeting regarding staff role and responsibility in bringing these things to maintenance man and early years managers attention in timely manner if go uncomplete for agreed period of time

19 March 2026

Eco Kidz Park Avenue, Sandymount · Regulation 29 — Premises

Provider's corrective action:
  • (c) The issue was reported to the Railway Union management team for assessment and a staff member cleaned the affected area using appropriate cleaning spray to minimise any hygiene risk. To prevent recurrence the bathroom area will continue to be checked regularly as part of the cleaning schedule and any signs of dampness or discolouration will be reported immediately to the Railway Union Management team

19 March 2026

Parkview Pre School, Dublin 15 · Regulation 29 — Premises

Provider's corrective action:
  • (b) The children will be brought to the secure, walled and gated communal green area outside the community centre. Management will ensure the children have access to a safe outside space

18 March 2026

Krazy Kids & Co t/a Creative Kids & Co, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • (d) The yogurt carton found in the leaves was immediately removed and a full overhaul of the outdoor area was completed on 19 March 2026. A caretaker has been employed in the mornings prior to using the garden to clean, tidy and ensure no debris is in the play area

18 March 2026

Rainbow Day Care Centre, Dublin 18 · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider has stated: 1. The water heater in Montessori 1 has been removed and relocated to the press under the sink in the kitchen area where it is better located to heat the water for Montessori 1, 2 and the kitchen area. The area of the wall where wires were visible through a gap has been repaired by the carpenter with a wooden panel. 2. The toilet washers were used to tighten the toilet seat to avoid future loosing. 3. New protective cover has been fitted to the light in the Montessori 3 room

11 March 2026

Ladybug Childcare LTD, Dublin 6 · Regulation 29 — Premises

Provider's corrective action:
  • 1. Following the identification of gaps remaining present in the flooring in both the junior and senior Montessori rooms, as well as the visibly worn condition of the existing floor covering, immediate action has been taken to address these issues. The service provider has engaged a specialist safety flooring company to attend the service and carry out a full replacement of the flooring. Confirmation of works has been secured, and a deposit has been paid to initiate the project. Photos with the new flooring in both, junior and Senior Montessori rooms will be emailed to Tusla inspectors in due course. Approved contractors specialising in safety flooring will be engaged for all future works. 2. Both locks have been replaced at the stair gate outside Senior Montessori Room and outside Junior Montessori room. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 3. In the Toddler room the skirting boards and the wood beneath the two windows have been freshly painted. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 4. In the Senior Montessori room, the heater was cleaned of all the dust and dirt, and the maintenance personnel repaired it and it is now in good condition. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 5. In the Junior Montessori Room, all windows have been thoroughly dusted, cobwebs removed and thoroughly cleaned. The windowsills in the junior Montessori room were thoroughly freshly painted. The window in the junior Montessori is now fully closed and lock has been fixed. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 6. In the Junior Montessori Room, the crack on the wall beneath the window has been filled and repaired. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 7. The Junior Montessori Room was fully repainted. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 8. In the Junior Montessori Room, the pillar was repaired and fully repainted. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 9. The Senior Montessori Room was painted thoroughly, including ceiling. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 10. In the Senior Montessori Room, the vents covers have been replaced, covering the holes in the wall. The windowsills have been repaired and fully repainted. Windows in the Senior Montessori room were thoroughly dusted and washed. The maintenance personnel will carry out monthly inspections to identify any issues on the premises. 11. In the outdoor area outside the Junior Montessori room the artificial grass surface that was coming away from the wall has been fixed and glued back. The maintenance personnel will carry out monthly inspections to identify any issues on the premises

9 March 2026

An Cosán Early Years - Colaiste Eanna, Dublin 7 · Regulation 29 — Premises

Provider's corrective action:
  • (d) In response to the non-compliance the service has stated that 20th April 2026, astro turf has been fixed to fill the gap and attached securely with pegs. This will be monitored daily to ensure it stays in place, as part of the daily outdoor checklist. The service is looking into accessing funding for permanent resurfacing of the garden

5 March 2026

St. Matthew's Primary School, Dublin 4 · Regulation 29 — Premises

Provider's corrective action:
  • The registered providers stated that: • The skirting board will be repaired on completion of the installation of a hot water system. • A monthly maintenance checklist is created to ensure that maintenance in all areas of the preschool is checked regularly

25 February 2026

Little Crickets Preschool, Malahide · Regulation 29 — Premises

Provider's corrective action:
  • (1) Change in Circumstances form has been submitted. Times will be displayed as per the correct operating hours

24 February 2026

Kids Inc Rathfarnham, Dublin 16 · Regulation 29 — Premises

Provider's corrective action:
  • o The anti-slip flooring on the staircase was repaired. o A bulb was replaced in the light fitting in the Toddler Room by the sink area. o The shelving unit in Toddler Room was repaired, and the residue was cleaned off o The low-level table in Toddler Room was replaced. o The blind in Toddler Room was cleaned thoroughly. o The flooring in Toddler Room was cleaned and buffed. o The premises will continue to be monitored by health and safety officer. All defects will be reported to the manager who will update the maintenance list and will report it to Head Office

23 February 2026

Treasure Tots Nursery, Dublin 10 · Regulation 29 — Premises

Provider's corrective action:
  • 1. The painter has been booked to paint the Toddler room on April 25th 2026. The painter has verbally confirmed. The painter is going to use a different paint that will reduce the possibility of paint chipping. They are also going to create a blackboard section so children can do mark making on this section of the wall. 2. The landlord has made arrangements for the ceiling tiles to be replaced in the Baby and Toddler rooms. Management will have to find suitable maintenance repair personal moving forward, who can be contactable on a regular basis. 3. The manager bought and replaced the toilet seat. 4. A company carried out an initial inspection and maintenance of the pump below the Toddler room sink, which connected to the two other sinks on the 24th of February. They determined the pump was broken and need to be replaced. The pump was order immediately and the work was completed on March 6th. Regular maintenance of the pump below the toddler room sink will be conducted when the grease traps are being maintained

19 February 2026

Parkside Childcare, Dublin 14 · Regulation 29 — Premises

Provider's corrective action:
  • A full renovation of the Pre -School 2A toilet has been carried out. New flooring and skirting boards have been installed to prevent buckling and corrosion. In addition, a larger sink has been fitted to minimise water spillage and support a safer environment. The daily risk assessment has been revised to ensure that staff monitor and check the toilet floor throughout the day. Maintenance personnel will conduct frequent inspections of the toilet area, and these areas will be prioritised for any required works

18 February 2026

Kids Inc., Swords · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action Maintenance work was carried out on these areas on 25 March 2026. Preventive Action The conditions of walls (especially when displays are removed will continue to be monitored by health and safety officer. All defects will be reported to the manager who will update the maintenance list and will report it to Head Office

17 February 2026

Pitter Patter Community Play Group, Dublin 7 · Regulation 29 — Premises

Provider's corrective action:
  • (c) The registered provider has spoken to the landlord of the service building and outlined the issue, making clear that the ventilation system being out of service is unacceptable. The landlord is in the process of taking steps to rectify the situation. An appointment has been made with a ventilation specialist to fix the problem. The registered provider has requested the landlord to check that the system is fit for purpose on a regular basis going forward

13 February 2026

St. Finbar's Playschool, Dublin 7 · Regulation 29 — Premises

Provider's corrective action:
  • (d) The walls in the playroom were sanded, cleaned and freshly painted. The registered provider will ensure all maintenance work in completed in a timely manner

12 February 2026

Minerva Montessori, Dublin 6 · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider has stated that the doors on the two cubicles have been replaced. They will not be removed again

12 February 2026

The Park Academy Beacon Court, Dublin 18 · Regulation 29 — Premises

Provider's corrective action:
  • 1. Ball pool was emptied, hoovered and cleaned. Ball pool will be emptied and hoovered and wiped out every second day. 2. Prior to the inspection it had been agreed that the Sanitary areas in Butterflies, Appledrops and Rascals are to be replaced this year. We are awaiting on contractor dates. Sanitary areas will be maintained moving forward. 3. The loft playhouse has been repainted. 4. Rascals room and sanitary area was cleaned on the evening of the inspection, and a professional deep clean of the room and sanitary area was done in the following days to include walls, skirtings, window sill, doors and floors. Bins were replaced. New chairs have been ordered. Cleaning checklists to be adhered to. Team retrained on this. Daily checks by management will be completed according to the Manager daily checklist. 5. Sink professionally unclogged. Drains annually maintained

4 February 2026

ABA Preschool Academy, Dublin 24 · Regulation 29 — Premises

Provider's corrective action:
  • (c) 1. The heating system is fully operational, and staff have full access to temperature controls to adjust heating levels as required. The nature of the programme includes high levels of physical activity (e.g., sensory circuits, trampoline use and movement-based activities), and room temperature is often adjusted in response to children’s activity levels. Following the inspection, heating levels were immediately increased to ensure the room temperature was maintained within the required range. 3 room thermometers have been ordered so we are able to continuously measure room temperature. (d) 2. A full deep clean of the premises took place following inspection. Deep clean have been scheduled for every break, i.e. midterms, easter, Christmas, summer. Alongside our usual cleaning schedules/ Rotas. 3. We are awaiting a quote from a painter and have planned to schedule works for the two-week break over Easter holidays. Painter is coming to quote on the 24th with works due end of March. 4. The area of flooring had an extra layer of lino in T3, which was glued to original floor and acted as a tripping hazard was removed. The glue was removed from the floor, the floor remains discoloured, in comparison to the rest of the floor but is clean and there is no risk of tripping. 5. The sink unit has been replaced. 6. The mirror has been fixed. The registered provider and management will complete a thorough check of the building before every school holiday break, so if anything needs to be repaired it can be done so with minimum disruption to the children. Anything identified with immediate concern will be rectified immediately

29 January 2026

Sundrive Nursery & Montessori School, Dublin 12 · Regulation 29 — Premises

Provider's corrective action:
  • (c) Heating settings were reviewed and adjusted immediately. Room temperatures were monitored following adjustment to ensure they reached the required range. The matter was addressed with staff on the day of inspection and expectations regarding maintaining appropriate room temperature were clarified. (d) Following inspection findings, the entire service was repainted to restore wall surfaces to an appropriate standard. A full deep clean of flooring and skirting boards was carried out in the Toddler and Baby Rooms to remove any build-up of dirt, dust and debris. The play kitchen in use in the Baby Room was repaired. The worn covering was removed and replaced with a washable surface to ensure effective cleanability. Laminate covering on shelving and room partitions that had worn away was removed and replaced to ensure that all surfaces can be effectively cleaned

26 January 2026

Clever Cloggs, Dublin 3 · Regulation 29 — Premises

Provider's corrective action:
  • (c) The registered provider reported that the heating issues were as a result of a recent storm and that these issues are now resolved. (d) The service plan to replaster the wall within the coming weeks. (e) The registered provider is in the process of fitting a door to the toilet cubicle

20 January 2026

First Steps Academy, Lucan · Regulation 29 — Premises

Provider's corrective action:
  • (b) All locks have been removed from emergency exit doors with immediate effect. No locks will be installed on fire doors going forward. (e) The service has ordered new changing tables to replace the existing nappy changing tables with units suitable for children over 12 months. The service will ensure that sanitary facilities are now fully suitable to meet the needs of children attending

13 January 2026

Saol Beag Project Creche, Dublin 1 · Regulation 29 — Premises

Provider's corrective action:
  • (c) 1. Draft excluders were installed in both care rooms. Management will ensure that draft excluders are in working order at all times. Staff will monitor the temperature throughout the day to ensure that it does not fall below 18℃ throughout the day. (d) 1. Both care rooms, door surrounds and skirting boards were painted. Management will ensure that the children’s centre is maintained regularly

12 January 2026

Olive’s Bizzy B’s Preschool Limited, Ballykea · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) A new grate cover was inserted. Preventive Action (d) Each day the garden is checked prior to the children entering it. Inform the committee that all safety in the garden is paramount. All issues will be brought to their attention, and assurance has been given in relation to any further repairs required

12 January 2026

The Embassy Montessori, Dublin 4 · Regulation 29 — Premises

Provider's corrective action:
  • (e) In response the registered provider has stated that a review of the service sanitary facilities took place following the inspection finding. Attendance has since returned to and is maintained within the registered maximum of 44 children unless and until approval for any increase in numbers is granted by the Inspectorate. • Any proposed increase in registered numbers will be applied for and approved in advance, ensuring facilities and resources are reviewed and approved prior to implementation. • Management will continue to monitor attendance levels and the availability and visibility of sanitary facilities to ensure ongoing compliance with the Preschool Regulations. • Management is satisfied that this was an isolated occurrence, and appropriate systems are in place to ensure continued compliance

6 January 2026

Giraffe Childcare Harcourt, Dublin 2 · Regulation 29 — Premises

Provider's corrective action:
  • (c) During the inspection, an engineer was on site and increased the temperature of the boiler leading to an increase in room temperature. Staff monitor the room temperatures daily as per our health and safety procedures. In circumstances where the temperature is not accurate, the management team is informed, and they report the issues straight away as was done on the morning of the 6th January prior to the inspectors arriving

2 December 2025

Marbles Creche & Montessori, Swords · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) 1. Wobbler room repainted. 2. New flooring ordered and awaiting to be fitted. 3. Toilet repaired. Preventive Action (d) 1. Monthly check to inspect walls throughout. 2. Monthly check to inspect floors throughout. 3. Daily check to ensure toilets are in order

1 December 2025

FamiliBase, Dublin 10 · Regulation 29 — Premises

Provider's corrective action:
  • Fences were painted and sanded. The management team will be checking the garden and risk assessing it weekly

13 November 2025

Little People's Montessori School, Dublin 6W · Regulation 29 — Premises

Provider's corrective action:
  • (d) The class room is cleaned twice daily and deep cleaned every Monday, Wednesday and Friday -steamed mopped, disinfected, dusted etc. The service will continue to do this but unfortunately it is an old building so for the amount of cleaning that is done it doesn’t reflect. There is a possibility that renovation work will be conducted this summer or in the very near future, which will help greatly. The service will continue daily and deep cleaning and will schedule a meeting with the community group in the new year to discuss all. (e) Maintenance of the entrance toilet will be carried out over the Christmas break. Handwashing has gone back to table by table, ensuring all children wash their hands and the task is carried out smoothly. No supporting documentation was submitted. Summary Comment The actions as stated by the registered provider address the non-compliance. The regulatory requirement has been met. Regulation 29 d & e will be reassessed on the next inspection

11 November 2025

Sticky Fingers, Dublin 15 · Regulation 29 — Premises

Provider's corrective action:
  • 1. Management is exploring the location to fit toilets for the Zebra cabin children. Once a plan is worked out Tusla will be informed. In the future management will ensure toilets are easy access to the children in all the rooms. 2. A nappy changing facility has been installed. Management will ensure there will always be a nappy changing facility available at all times for children who require one

30 October 2025

Tir Na Nog Creche & Montessori, Dun Laoghaire · Regulation 29 — Premises

Provider's corrective action:
  • (c) The property owner has been informed of the outcome of inspection in relation to ventilation and the registered provider awaits further review. It may take six months for an update. (d) The property owner has been informed of the outcome of the inspection in relation to a leak in the ceiling and window of the cot room. In the interim the wall at the window area has been sealed and repainted. The walls in the toddler room were also filled and repainted following inspection. The press door in the Toddler room was resealed following inspection

22 October 2025

The Stables Montessori, Portmarnock · Regulation 29 — Premises

Provider's corrective action:
  • (c) The registered providers have had experts come in to see if they can do anything re ventilation without touching the external walls of the building. As the building is old, this has always been an issue but they will endeavour to try and rectify the issue permanently once a correct action is found and the landlord is agreeable. However, as an action the registered providers will ensure that the window near the bathroom is opened to ventilate the area at all times and they will keep the classroom windows open when further ventilation is necessary

21 October 2025

Mini Trinity Montessori, Swords · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) The soft pull-out sofa was washed and stitched. The foam is no longer exposed. Preventive Action (d) Any furniture or materials that are showing wear and tear will be recycled or disposed of if not in a state of repair

24 September 2025

Links Childcare, Portmarnock · Regulation 29 — Premises

Provider's corrective action:
  • (c) In response the service has stated that they have engaged with their plumbers, and the heating system timings have been readjusted. The room temperatures in the rooms have been checked, and they have not gone above the recommended temperatures of 18-22 o C. Heating system timings adjusted accordingly

8 September 2025

Rosemont Pre-school, Dublin 16 · Regulation 29 — Premises

Provider's corrective action:
  • A nappy changing unit has been ordered. This will be put in the toilet block as the designated nappy changing area to maintain the children’s privacy and dignity as well as promoting a higher standard of hygiene, safety and efficiency as advised. The existing policy has been updated to incorporate most of the issued raised in the inspection to use until the unit is delivered. This updated policy has been read, understood and signed off by all members of staff. The person in charge developed a new policy and procedure to be used when the new unit is delivered. This new policy will then be read, understood and signed off on by all staff members to ensure they understand their responsibility in this matter

4 September 2025

Little Saints Creche, Rathcoole · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider submitted the following response: Corrective and Preventive Action (d) - The two children’s chairs and the armchair in the Baby room were cleaned and are now washed down each Friday. New blankets were purchased for the armchair. Staff will add the chairs to their weekly cleaning sheet so they will now be cleaned each Friday. - The children’s playhouse and the windowsill were painted. Staff will make management aware when painting needs to be completed in all rooms. The painter is due to return to complete painting over the bank holiday when no children are present

2 September 2025

Links Childcare Foxrock, Foxrock · Regulation 29 — Premises

Provider's corrective action:
  • A full investigation was carried out to identify the source of the malodour in the two affected sanitary units in the main hall. The sewerage and drainage systems were inspected and confirmed to be clear and fully operational. The toilet areas underwent a deep clean by the cleaning team, including steam cleaning of all tiled surfaces to remove any lingering odours. Air fresheners have been installed in the affected toilet units to help maintain a pleasant environment. Weekly checks of the toilet areas are now conducted by the manager/deputy manager, and any issues are reported immediately to the regional manager

4 July 2025

Little Rugrats, Skerries · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) 1. The leak has been fixed. 2. Exposed pipes have been covered. 3. Damaged paintwork has been repaired. 4. The large slide has been removed and replaced by new one. Preventive Action (d) 2. Pipes have been covered. 3. Regular monitoring by manager on damaged areas and to address immediately. 4. Continuous monitoring by manager that all equipment is in good repair

1 July 2025

Kkcreche Ltd, Dublin 12 · Regulation 29 — Premises

Provider's corrective action:
  • 1. The upstairs nappy changing table with a worn lacquered surface has been newly wrapped with vinal wrapping to ensure the surface can be cleaned properly. This ensures the surface is hygienic and suitable for daily use. All furniture in changing areas is now checked monthly as part of the maintenance schedule. Any signs of wear will be reported and addressed immediately. 2. The damaged linoleum at the door to the Toddler room has been repaired, and the flooring has been secured to remove the trip hazard. The area was made safe on the same day. Weekly checks are now carried out on all door entry flooring to identify and fix any lifting or damage early, preventing similar risks in future. 3. The damaged radiator cover near the rear toilet has been sanded and sealed, and painted with washable paint All radiator covers have been reviewed for wear and are now part of the bi-monthly maintenance inspection. Any worn surfaces will be promptly refinished or replaced. 4. The broken outdoor gate and its attached wooden fence were removed and replaced with a secure removable, child-safe gate. All broken wood, splinters, and rusted nails were safely disposed of. Outdoor structures will be inspected weekly by staff and formally checked monthly by management to ensure all equipment remains secure and hazard-free. 5. The gaps and holes in the shock-absorbent surfacing have been filled and repaired, creating a smooth, even surface. The play surface is now checked daily before outdoor time and included in the monthly facility audit. Repairs will be arranged immediately if damage is found

30 June 2025

Popcorn Childcare, Skerries · Regulation 29 — Premises

Provider's corrective action:
  • (d) In response the registered provider has stated that this issue has been fixed, and a visual inspection of taps will take place on a regular basis

19 June 2025

Little Apples Ltd, Swords · Regulation 29 — Premises

Provider's corrective action:
  • (d) The registered provider submitted the following corrective and preventive actions in relation to the maintenance and cleaning. 1. The window glass was replaced, and they will ensure that such cracks etc are reported and replaced as soon as possible. 2. Both containers under the sinks were removed. The Montessori sanitary area was deep cleaned and was discussed with the cleaners. A deep cleaning in these will be added to cleaning records. 3. Cleaning sheets have been updated and implemented. They will be signed by cleaners daily and checks completed by the manager. 4. The skirting board was repaired and discussed with staff the importance of reporting any hazards. 5. A new table was purchased discussed with staff the importance of reporting any repairs. 6. The step has been repaired and checking the stairs has been added to the risk assessment. 7. The area has been repaired, and management will check this area as it is used by different groups

17 June 2025

Little Treasures Preschool Playgroup, Dublin 12 · Regulation 29 — Premises

Provider's corrective action:
  • Temporary air conditioning units have been placed in the setting. An air conditioning system is getting built into the settings building

16 June 2025

Whitefriars Childcare Ltd, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • (c) Air-cooler machines have been purchased for the Baby, Toddler and Montessori rooms, with an additional machine or the Wobbler room under order. The machines will be timed to cool the rooms prior to the children arriving in the morning. A canopy has been installed outside the Baby room window to provide shade and reduce heat in the room. A risk assessment has been developed to assess temperatures and a new thermometer to gauge temperatures throughout the day

11 June 2025

Kids World, Dublin 5 · Regulation 29 — Premises

Provider's corrective action:
  • 1. The area has been thoroughly cleaned, and the dry growth has been removed. Regular maintenance inspections have been implemented. 2. The area has been thoroughly cleaned, and repainted. Regular maintenance inspections have been implemented. 3. The unit has been thoroughly cleaned. This has been added to the classroom cleaning schedule. 4. The area has been repaired. Regular maintenance inspections will be more thorough. 5. The children’s sofa in the Montessori room has now been removed and replaced with easily maintainable cushions

10 June 2025

Child's Play, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) The radiator cover was repaired and there are no longer gaps. The hole in the wall in the upstairs playroom was repaired as part of building wide painting and redecoration. Preventive Action (d) Management has instigated a weekly building walk through of the entire building and garden in order to spot and fix any risks immediately. Staff were encouraged to report any damage to management so that it can be fixed promptly. Staff complete daily risk assessments of the rooms

4 June 2025

Really Cool Afterschool & Montessori School, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) Walls have been painted and repaired. Preventive Action (d) They will perform regular checks for facility conditions

3 June 2025

Choice Childcare Newcastle, Newcastle · Regulation 29 — Premises

Provider's corrective action:
  • Hand dryer -Staff have been advised to use a certain cleaning product when required if stains are hard to remove. Flooring- Staff have been advised to use a certain cleaning product and a scouring pad to help remove the tougher staining on floor. Surfaces and storage in the classrooms have been more detailed on the cleaning sheet and staff are required to clean more regularly on a daily basis and a deeper clean on a Friday. Drink bottles that were in a tray will be placed in a different area of classroom and the wooden table has been removed. Classroom fridges are used daily, and the staff has been advised to keep a closer eye on the cleanliness of the fridges throughout the day. Management have reviewed the cleaning and risk assessment sheets for the rooms and have gone through these changes with the staff, to ensure all areas are covered in both classroom and bathroom

27 May 2025

Meadows Preschool, Dublin 22 · Regulation 29 — Premises

Provider's corrective action:
  • 1. The fence to the rear of the outdoor play area has been repaired and the panel has been secured to the post. 2. The damaged plaster has been repaired. A thorough examination of all areas in the garden will take place every Monday to ensure the area is safe

14 May 2025

The Children's Village, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Preventive (d) A digital room thermometer is placed in the room each morning at the opening and set up. The temperature is checked by staff and documented. This happens in the baby room / toddler room and cot room daily. When the room reaches elevated temperatures there is a protocol in place which includes introduction of a fan, open windows, remove children where possible. Preventive Action (d) Staff know the protocol to follow. Room thermometers provided in rooms to indicate rising temperatures. Management will also spot check this to maintain the correct room temperature

30 April 2025

Charlies Childcare, Swords · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Actions: (c) • The services’ staff deep cleaned the vent and hoovered out all dust. • Air fresheners have been placed in all sanitary areas. • There is also a nappy changing bin schedule mid-day to eliminate odours. Preventive Actions: • Management will check that nappy changing bin schedule is being followed, and all bins are changed mid-day. • Hoovering vents has been added to weekly cleaning sheets to be completed by cleaning staff. • Air freshener refill will be ordered monthly

9 April 2025

Mrs Giggles, Dublin 22 · Regulation 29 — Premises

Provider's corrective action:
  • A new nappy changing unit has been installed in the service, this will prevent children from the ECCE room waiting for the changing room to become available

25 March 2025

Rainbow Community Playgroup, Dublin 7 · Regulation 29 — Premises

Provider's corrective action:
  • Staff members supervise the children to ensure they wash their hands efficiently. A step and a funnel are also in place in the care room to facilitate handwashing as there is no space for a second wash hand basin in the sanitary accommodation

17 February 2025

Pearse College Nursery, Dublin 12 · Regulation 29 — Premises

Provider's corrective action:
  • 1. Two new shelving units have been purchased and the worn ones replaced. These will be added to the weekly risk assessments in the rooms. 2. This coat hook was tightened. These will be added to the weekly risk assessments in the rooms. 3. The hinges on the press were tightened. The hinges on all of the presses in the building were tightened. 4. The radiator cover was tightly secured to the wall. The radiator covers will be checked as part of the weekly risk assessments. 5. The lino has now been re-secured to the wall. The lino will be checked as part of the weekly risk assessments. 6. The sticky residue from adhesive tape has been thoroughly cleaned. Adhesive tape will no longer be used to stick artwork. 7. The rugs have now been replaced. The rugs will be checked as part of the weekly risk assessments. 8. The walls have now been painted. 9. The wooden structures have been removed from the playground. A pressure washer has been bought to ensure cleanliness in the garden. 10. All rooms have been deep cleaned. Management will ensure that all rooms continue to keep a high standard of cleanliness

30 January 2025

St Helena's Resource Centre, Dublin 11 · Regulation 29 — Premises

Provider's corrective action:
  • (c) The person in charge responded on the 31 Jan 2025 to state that the service was to close until this issue could be resolved. The registered provider responded on the 7 February 2025 to state that, windows have been fitted, and the heating system in the service is working

28 January 2025

Whitefriars Childcare Ltd, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective actions: 1. All sinks and taps have been fixed and secured. Checking bathrooms has been added to the daily risk assessment of the service. 2. Toilet roll dispensers have been fixed and are in good working order. Checking bathrooms has been added to the daily risk assessment of the service

22 January 2025

Little Rascals / Clever Cloggs, Dublin 9 · Regulation 29 — Premises

Provider's corrective action:
  • s 1. The vent was cleaned, and a reminder to clean vent was added to the risk assessment. Actions were put in place with the service’s cleaner to ensure the vent remains dust free. A reminder was added to cleaning vent. 2. The mould has been treated and painted. Regular checks will be carried out; management also added regular checks to our daily risk assessment

5 December 2024

Happyways Greenfields, Dublin 9 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (e) Management have discussed this with the committee and have been given permission to sign post two of the cubicles to be used only by children attending the service during operating hours. Preventive Action (e) The sign posting of these cubicles has been added to the daily risk assessment to make sure it is completed daily

3 December 2024

Acorns Montessori, Rush · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider stated the following corrective actions, and preventive actions have been undertaken: Corrective Action (d) 1. The registered provider has ordered a strong coloured plastic cover to seal off the underneath of the raised decking area from children. The registered provider will send on photographs when the work is complete. The registered provider will seal it off in the meantime with a temporary cover. The registered provider has cleared out the narrow gap between the two sheds. Preventive Action (d) 1. The registered provider will ensure that this is included in the service’s risk assessment forms for the outdoor space

27 November 2024

St. Nicholas Montessori School, Dun Laoghaire · Regulation 29 — Premises

Provider's corrective action:
  • The corrective actions as stated by the registered provider once completed will address the non-compliance

18 November 2024

Small Steps, Dublin 15 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective actions: (d) New skirting boards were fitted, sealing the wall to the floor. (e) A plumber was engaged on the 7 January 2025 to address the water pressure issues. Preventive actions: (d) Skirting boards have been fitted and all areas around the skirting are sealed. (e) The sinks will be checked on a regular basis to ensure they are not blocked

13 November 2024

Phoenix Childcare, Dublin 15 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action There were 5 toilets available on the day of the inspection. Two of the 5 toilets were allocated to creche use only with signage. Three of the 5 toilets were for the use of others using the community centre & the creche. Once this was highlighted by the inspector 4 of the 5 toilets were immediately allocated to creche use only and the public were directed to use other toilets in the centre during creche opening hours. Signage has been put up to inform the public that the toilets are for creche use only. Preventive Action Signage has been put up to inform the public that the toilets are for creche use only

23 October 2024

Mead Day Care Centre, Dublin 13 · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action The service has now secured interim access to another child's toilet through the Sand Room. The additional sanitary accommodation will be available exclusively for staff and children of Mead Day Care centre and a key to this facility will be held by all staff members in Mead Day Care Centre. Preventive Action The service is planning on removing the two urinals present in the onsite bathroom which will then provide for privacy and complete use of the child's toilets in that area. In addition, the service plan on installing a fifth toilet in this bathroom which will address the non-compliance. Management hope to have this work completed within 3 months

26 September 2024

Little Acorns Montessori, Dublin 3 · Regulation 29 — Premises

Provider's corrective action:
  • (e) The service has received permission from the Parish to put in extra sink in bathroom. Parish have contacted their plumber and the service is waiting for confirmation of date for commencement of works for a sink to be installed in the bathroom

1 May 2024

Circle of Friends, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) The outer covering on the small armchair in the main preschool room was recovered to cover the exposed foam and prevent spread of infection. Preventive Action (d) Regular checks of worn furniture has been added to the cleaning schedule to prevent the spread of infection. Summary Comment Photographic evidence of the repairs to the armchair were requested from the registered provider on the 20/06/2024, the registered provider stated in an e mail received on the 25/06/2024 that the armchair has been removed and replaced. The evidence submitted by the registered provider in relation to regulation 29 - Premises has been reviewed and accepted

1 May 2024

Lorraine's Montessori School, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action (d) Chair is no longer on premises. Preventive Action Regular checks of worn furniture are added to the cleaning schedule. Summary Comment The evidence submitted by the registered provider in relation to regulation 29 - Premises has been reviewed and accepted

23 April 2024

Little Feat, Dublin 14 · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider submitted the following response: Corrective and Preventive Action 1. Instructions have now been placed on nappy changing sheet to remind staff each morning to ensure bathroom window open. 2. The linoleum floor in the caterpillar room will be completely replaced. The dark areas of discoloration on the linoleum in the treehouse will be removed and replaced. The dark areas of discoloration on the linoleum in the Montessori classroom will be removed and replaced. Fitting to be completed within the next week. A dehumidifier will be rotated periodically among the relevant rooms to ensure no damp within the building. 3. New toilet seat purchased and loose one fixed by maintenance

23 April 2024

Market Green Montessori, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider stated the following corrective action will be undertaken: Corrective Action: To install a partition in the bathroom to provide privacy for the children when using the toilet. Work to be completed by 4th September 2024. Summary Comment The non-compliance under Regulation 29(e) remains outstanding as evidence has not been submitted to demonstrate that privacy partitions and doors have been put in place. Once completed, the registered provider is required to submit evidence that a partition and doors have been installed and the suitability of this will be assessed at the next inspection

22 April 2024

Ronanstown Community Childcare Centre, Dublin 22 · Regulation 29 — Premises

Provider's corrective action:
  • (c)(d) All vents have been cleaned. We have put the cleaning of the vents on the end of day routine

10 April 2024

Sandymount Green Montessori, Dublin 4 · Regulation 29 — Premises

Provider's corrective action:
  • The toilet seat was attached to one of the toilets. The toilets seats will be checked regularly in order to make sure they are safe to use by children

22 January 2024

Early years service TU2015DY305, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • (d) Corrective Action 1. The fridge has been removed from the Montessori room as it is not in use. The microwave was cleaned. 2. The steps in the Toddler room were washed and a new chair was provided for the Montessori toilet. 3. The floor has been repaired. 4. The walls in the room have been cleaned and will be maintained. Preventive Action 1-4 Manager/Assistant manager will carry out daily checks in the rooms and premises, to ensure the rooms and equipment are in good condition and cleaning procedures are correctly followed

15 January 2024

Little Wonders Pre-School, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • (c) Registered Provider did apply for a grant from DCYA to install a heating system, but unfortunately, she was refused. It was extremely cold on the day of inspection. However, now they have more heaters, and it is warm. Preventive Action (c) Registered provider will continue to apply for grants to get heating installed and make it their business to make sure the environment is warm

10 January 2024

Really Cool Afterschool & Montessori School Ltd, Balbriggan · Regulation 29 — Premises

Provider's corrective action:
  • (e) Registered provider spoke to their handy man/maintenance man who informed that it would be not safe to put the unit up on the wall as it’s a partition wall and would not hold such weight. Manager is looking into something on wheels that they could bring to the room, but there is no place to store it. Foldable units that they have found are not suitable for such big children who attend their service. They are searching the internet for a solution. Service needs more time

6 September 2023

Mercy Family Centre, Dublin 8 · Regulation 29 — Premises

Provider's corrective action:
  • (c) The service has stated that windows will remain open for adequate ventilation and ensure cooling in all rooms throughout the session period. Damaged window to be repaired in Toddler room 1 to enable better ventilation (4 weeks)