Creche Inspection Reports

Regulation 29 in Wicklow

Premises: 11 non-compliance(s) in the latest reports we read.

An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

31 March 2026

Safari Childcare, Bray · Regulation 29 — Premises

Provider's corrective action:
  • (c) 1. The company maintenance team replaced the damaged ceiling tiles and checked for further damp issues and were happy that there were none. Going forward works will be completed in full in a timely manner. 2. A drain clearing company surveyed the site and found a copper pipe under the sink which had not been sealed allowing bad odours to travel back up the pipes. Our maintenance team carried out a full check of the plumbing for all sinks and sealed additional pipes as required

4 March 2026

Sonasámh Montessori Scoil, Baltinglass · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1-5 A painter is in working at the moment and has started on the outer building and will continue to re-paint other items. The painter is progressing with what is needed for the school and he is due back to finish the sink surround and play structures. New wooden play frames were purchased for the outdoors. We will keep more of an eye on equipment looking unkept. We have asked Staff to note any broken fixtures and have them fixed quickly

23 July 2025

Riverside Childcare Rathdrum, Rathdrum · Regulation 29 — Premises

Provider's corrective action:
  • (d) We have now purchased all the needed materials to re-paint our room’s walls with suitable paint and also the windowsills. We recently painted one room and will be doing the second soon. Staff are aware of the damage reusable adhesive did previously to the paint. Regular inspections of the walls, furniture and windows are being carried on by management

26 June 2025

Cocoon Childcare- Blessington, Blessington · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The maintenance team have replaced all counter tops in all care rooms. A deep clean of all chairs and tables took place, and replacement tables and chairs have been ordered. A centre cleaner has been appointed to support the upkeep and hygiene of premises, care rooms, and equipment. The centre management team will actively monitor the effectiveness of the cleaning schedule and ensure all furniture is well-maintained. 2. Repairs were carried out on floor beading in the Wobbler and Toddler care rooms, and all laminate flooring was deep cleaned and buffed. The maintenance team is scheduled to replace laminate flooring in the Wobbler junior. Junior preschool, and Preschool 1 care rooms, with completion expected by the end of this year. The centre management team will notify the Operations team of any maintenance repairs required within the centre

9 April 2025

Sakura Montessori, Naionra and Afterschool, Blessington · Regulation 29 — Premises

Provider's corrective action:
  • 1 & 2. All rooms, ceilings, walls, tables, chairs, counter tops, doors, windowsills etc will have their annual painting in July when the ECCE is closed and the rooms not in use. 3 The outdoor picnic tables have been repainted. Seats have been ordered from the UK to replace the cracked ones on the outdoor trestle table. 4. The stairs to the Playgroup and Naionra will have an annual painting in July when the classes are not in use. 5. The laminate floor in the Naionra has been it poses no risk to the children as there are no sharp edges or holes. We will replace the floors when funds become available

26 March 2025

Little Oaks, Bray · Regulation 29 — Premises

Provider's corrective action:
  • The ceiling panel and ceiling lights have now been removed. In the week commencing 30th June to July 4th a new ceiling will be fitted in this area with appropriate lighting

24 February 2025

Ashford Montessori School, Ashford · Regulation 29 — Premises

Provider's corrective action:
  • 1.The sliding door is now repaired and moves smoothly. Regular checks will be carried out on the door to ensure it moves smoothly. 2. The door saddle was pared with a plane and now moves freely. Regular checks will be carried out to ensure the door continues to move freely. 3.Under coat paint has been applied and will be covered in a gloss finish. Regular maintenance will be carried out. 4.The area behind the sink has been tiled. This area will be cleaned regularly. 5.All windows and shelving have been cleaned, cobwebs have been removed from the sanitary area. Going forward checks will be carried out to ensure that the areas are clean and well maintained. The service will employ a regular window cleaner

13 February 2025

Donard/Glen Daycare, Donard · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1.-4. A part-time handyman has been employed 2 days a week to address the non -compliances that were identified and will rectify in due course. There will be a regular walk through the premises and outdoor areas to note and attend to any repairs needed

21 November 2024

Cois Cairn Community Playgroup, Bray · Regulation 29 — Premises

Provider's corrective action:
  • (b)(d) We have employed a company to power wash the playground. Our caretaker will carry out inspections weekly. We are purchasing a power washer for the caretaker to use in the future

18 September 2024

Orahova Montessori School, Greystones · Regulation 29 — Premises

Provider's corrective action:
  • An air conditioning unit permanently installed, and temperature of room checked prior to arrival of children and hourly thereafter

18 September 2024

Stepping Stones Pre-School, Ashford · Regulation 29 — Premises

Provider's corrective action:
  • (d) The playhouse has been sanded and painted. The painting of the playhouse will be incorporated into the yearly painting of the school