Regulation 29 in Sligo

Premises: 10 non-compliance(s) in the latest reports we read.

An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

13 March 2026

Knock na Shee Pre-School, Ballymote · Regulation 29 — Premises

Provider's corrective action:
  • This area has been cleaned and painted. We will ensure to keep on top of cleaning and painting and include this area on our toilet checklist

6 March 2026

Cre8ive Corner Creche Farmhill Manor, Sligo · Regulation 29 — Premises

Provider's corrective action:
  • In a written response the registered provider stated:

10 February 2026

Lollipop Lane Creche, Montessori and Afterschool, Tubbercurry · Regulation 29 — Premises

Provider's corrective action:
  • In a written response the registered provider stated: The Plumber has been out and fixed the hot water tap in the Olives and the Elms room. All taps have now got thermostatic mixing values to ensure the hot water temperature always stays at an appropriate level for the children. Willows room sanitary accommodation mechanical extractor fan has been repaired and in working order

15 January 2026

Happy Days Creche, Sligo · Regulation 29 — Premises

Provider's corrective action:
  • Contacted landlord to replace missing tap

13 October 2025

Cre8ive Corner Creche, Sligo · Regulation 29 — Premises

Provider's corrective action:
  • (1) We have touched up all flaking paint. We will do checks on each room to see if the rooms need topping up. (2) All taps have been replaced with new taps Check taps on monthly basis

24 September 2025

Little Angels, Sligo · Regulation 29 — Premises

Provider's corrective action:
  • 1. All the wires have been removed the room will be freshly painted Walls will be painted when needed and all wires will be removed if visible

7 May 2025

Little VIPs Playschool, Ballymote · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider has advised in the corrective and preventative action response that the service is closing

9 April 2025

Ballintogher Community Childcare CLG, Ballintogher · Regulation 29 — Premises

Provider's corrective action:
  • (e) A nappy changing unit has been installed and a box with all necessary materials to change nappies is brought into the area for the changes and brought back out again when not in use The nappy changing unit will remain in the service

1 April 2025

Magic Moments, Ballisodare · Regulation 29 — Premises

Provider's corrective action:
  • 1. There are plans for adding an additional toilet. In the interim the storeroom has been cleared out and is now accessible to staff. The toilet has been given a deep clean and restocked. It is now accessible and in use for staff. We have contacted an architect to draw up plans for reconstructing part of the afterschool. These plans will include a new staff toilet. The building work is due to commence in August 2025

2 May 2024

Tir na nOg, Collooney · Regulation 29 — Premises

Provider's corrective action:
  • (c) • The mechanical ventilation system has been replaced and are in good working order. The ventilation systems will be checked and maintained regularly and replaced when needed. (d) • The wooden fence separating the outdoor play areas has been removed and replaced with an additional mud kitchen, sandbox and flower planter. The new mud kitchen, sandbox and flower planter outdoors will be maintained regularly. • The picnic benches in the outdoor area have been sanded down and repainted. The picnic benches will be maintained and painted when needed. • A section outdoors that had broken and used toys has been removed. Any broken and unused toys will be removed from the play areas. • The cistern lid in one of the toilets has been replaced with a new toilet. The toilets will be maintained and replaced when necessary. • The ceiling in the care-room has been painted. The care rooms will be painted and maintained on a regular basis. (e) 1. The water temperature in the sanitary units has been adjusted to 43°C. The water temperature in the sanitary units will be checked regularly to ensure it is the correct temperature. 1. It was discussed at a staff meeting that any child that requires a nappy change will be changed in the Wobbler care-room on a high waist changing unit A notice will be displayed in the care-room as a reminder that children must be changed in the wobbler room on a waist high changing unit