Oakview Village Childcare, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • 1. The Perspex roof has been replaced to ensure the area is safe, secure and maintained to an appropriate standard. The roof is added to the monthly maintenance checks to ensure that any damage will be repaired immediately. 2. The picket fence was removed in full and replaced with a new fence. Each of the areas of the timber fencing and wooden structures have been added to the monthly maintenance checklist. 3. All the horizontal slats on the picket fence were inspected and secured with nails where required. There was a full safety check completed to ensure that all the slats were securely fixed and stable. All fencing and wooden structures are included in the monthly maintenance list

9 April 2026

Dromtacker Creche Limited, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • 1. The windowsills will be painted before 15.5.’26. The service will ensure the health and safety office reviews the paint regularly and the windowsills will be painted when needed. 2. The picnic bench has been removed and it will be replaced. The maintenance of the outdoor furniture will be monitored and fixed/replaced as needed

30 March 2026

Danú Childcare, Killarney · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider stated in their response: Corrective action (d) 1. The timber had been removed from the area. 2. Vent covers have been replaced. 3. The downpipe has been secured to the wall with new screws. (e) 4. A new sink was installed in the staff bathroom within the toddler and nappy changing area. 5. A new sink was installed to ensure there are 3 sinks in the children’s toilet area to match the three toilets. Preventive action (d) 1. Management will inspect the building more often to see if anything needs to be removed or fixed. 2. The staff will be more observant in relation to the vents to ensure they do not cause injury to the children. 3. Management will inspect the building more often to see if anything needs to be removed or fixed. (e) 4. Ensure the service has enough sinks to match the numbers of toilets in the building. 5. Ensure the service has enough sinks to match the numbers of toilets in the building

18 March 2026

Naíonra an Leitriúigh, Trá Lí · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The cupboard doors now have child locks in place; the doors are closing fully so as children have no access to them. The cupboards will be locked daily to ensure that the children have no access. 2. The water flow has now increased to the 3 wash hand basins after recent work was carried out on the water supply in the area

2 March 2026

Muire Gan Smal Childcare, Castleisland · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider stated in their response: Corrective action The sink area has been painted in the Blossom room. Exposed gaps around the sink has been filled and the area has been painted in the Buds room Preventive action Ensure that all areas are cleaned and maintained

22 January 2026

M&M Childcare Ltd T/A Meadows Childcare & After Schools, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • 1. The gate has been repaired and re-installed. 2. The area of the wall was filled and plastered

12 January 2026

Pobal Leanaí t/a Club Spraoí, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • (c) Temperature-controlled heating units have been installed in all sanitary areas across the premises to ensure a consistent and safe ambient temperature for the children. The heating was immediately activated, and the temperature levels were rechecked to confirm compliance. All the sanitary accommodation will be included in daily environmental checks, the temperatures will be recorded and any fluctuations will be addressed promptly. Management will continue to review the effectiveness of the temperature-controlled heating systems, particularly during colder periods, to ensure children’s comfort, health and welfare at all times

29 October 2025

St. Brigid's Pre-school Crèche, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • (d) The rear outdoor area is currently off limits and has been since the inspection until all the necessary works are complete. The area will be monitored and reviewed to prevent recurrence. • Currently the timber fence is being replaced • The 2 goals posts have been discarded as the frame was not strong enough after replacing the netting. • Currently replacing the soft matting. • The pathways in the outdoor lay area have since been power washed and cleaned

23 October 2025

Rainbows Pre-school Playgroup Ltd, Glenbeigh · Regulation 29 — Premises

Provider's corrective action:
  • The black mark has been removed by a professional cleaning product, primed with mould prevention and re- painted. The blocked shutters have been cleared and the loose felt on the side of the shed had been repaired which we believe caused the dampness. A monthly check will be added to the cleaning schedule. An industrial dehumidifier provided by the community handball hall will be used 1-2 times each month as a precaution. Daily ventilation will be provided. (d) 2.The damaged section of the roof on the outdoor playhouse has been removed, repaired and the edges have been sealed. The edges of the roof have been sealed and covered to prevent any future spread of dry rot. The playground has been added to the maintenance checklist, treatments or repairs will be carried out as necessary. (e) 3.The toilet seat has been re-attached

1 October 2025

Kilflynn Preschool And Afterschool Club, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • 1. The timber panels have been secured with nails; it is of sound structure. The designated person in charge will risk assess the outdoor area daily and take action if required

27 August 2025

Camp Community Childcare CLG, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The broken door handle was disposed of and a new door handle fitted. A weekly visual inspection by staff will be carried out. (e) 2. The staff bathroom has been relocated to the bathroom off the kitchen area lobby. Staff also have access to the bathroom in the sports hall. The former adult bathroom is now used as a nappy changing area for children; there is a fully functioning changing table with a low height wash hand basin in place. This new nappy changing facility will remain in place

20 August 2025

Childsplay Creche Limited, Ardfert · Regulation 29 — Premises

Provider's corrective action:
  • (e) The plumber fixed the water

29 July 2025

Buddies Crèche & Childcare Facility, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • (c) 1. The light has been replaced and is now in working order. (d) 2. All the broken window blinds were removed. A quotation was obtained, and the blinds will be installed over the next 4 weeks. (e) 3. An additional sink will be installed in the senior pre-school room sanitary accommodation within 4 – 6 weeks approximately. 4. The service has access to additional toilets within the building

2 April 2025

Sneem Community Preschool & Créche, Sneem · Regulation 29 — Premises

Provider's corrective action:
  • In the corrective and preventative response (CAPA) received from the person in charge the following was stated: Corrective and Preventive Action (e) Funding is in the process of being requested from Pobal in order to install a new wash hand basin (as well as plumbing system). In the meantime, a wash hand basin located in the preschool room will be designated for the children to wash their hands after going to the bathroom

17 February 2025

Greta's Childcare, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • The bulb in the ceiling light has been replaced. The registered provider will complete regular maintenance checks

21 January 2025

Naíonra Annascaul CLG, Annascaul · Regulation 29 — Premises

Provider's corrective action:
  • 1.& 2. An electrician will carry out the work and fix the mechanical ventilation and install a fan heater week beginning 10.03.’25

15 January 2025

Little Leaders, Lixnaw · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The ceiling has been repaired and painted. 2. The window ledge had been cleaned. (e) 3. The adult toilet seat was repaired

7 November 2024

Sliabh Luachra Montessori, Rathmore · Regulation 29 — Premises

Provider's corrective action:
  • 1. A new waste pipe has been fitted. Staff will regularly check to ensure there is no broken sharp edges evident. 2. The Air vent has been replaced and staff will monitor this in the future. 3. A new cleaning record is now in place and staff will ensure this is used

8 October 2024

Little Voyagers Childcare, Ardfert · Regulation 29 — Premises

Provider's corrective action:
  • An additional changing unit will be fitted to the wall in the changing area. The expected delivery date for the unit is between 15/11/’24 and 19/11/’24

1 August 2024

Scartaglen Childcare Centre, Killarney · Regulation 29 — Premises

Provider's corrective action:
  • (e) An additional toilet for adults is now available upstairs

8 July 2024

Tir na Nog Community Childcare, Ballybunion · Regulation 29 — Premises

Provider's corrective action:
  • (d) This was cleaned and painted by a professional. (e) A new child stair is provided

2 July 2024

Na Leanai Childcare Service, Causeway · Regulation 29 — Premises

Provider's corrective action:
  • A nappy changing mat has been installed in the nappy changing room with the wash hand basin in the toilet area attached to the nappy changing area

10 April 2024

Bebé Crèche & Montessori, Killarney · Regulation 29 — Premises

Provider's corrective action:
  • (d) (1) The doors under the sink in the Pre-school 2 care room have been replaced. Staff have been reminded to inform management of any equipment which needs replacing. A repair log is now available to record any repair/replacement issues. (2) The handle on the window of the Pre-school 4 care room was replaced. Staff have been reminded to inform management of any equipment which needs replacing. A repair log is now available to record any repair/replacement issues. (3) The washers on the tap in the Pre-school 1 sanitary area, were replaced by the plumber. Staff have been reminded to inform management of any equipment which needs replacing. A repair log is now available to record any repair/replacement issues

27 March 2024

Stepping Stones Childcare & Pre-School, Tralee · Regulation 29 — Premises

Provider's corrective action:
  • (b) The two broken window handles in the Senior Pre-school and the Toddler care rooms have been replaced. (c) The air vent in the Waddler nappy changing room has been cleaned. Staff have been reminded of the importance of keeping air vents free from dust

17 January 2024

Feileacan Pre-school, Listowel · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider stated that: - Corrective and Preventive Action (c) The Electrician has installed a fuse board for adequate plug facility in the storeroom, providing a source of power for the heaters to be safely plugged in. The heaters are in working order. (d) The club are plastering and repainting ceiling in the single toilet. A timeframe of 6 weeks has been given for this to be completed. As the proprietor of the service, she will ensure that any repair to the preschool building will be noted straight away to the club chairperson

17 January 2024

Scallywags Pre-school, Killarney · Regulation 29 — Premises

Provider's corrective action:
  • (c) (1) A new heater has been installed in the bathroom area. (2) The temperature on the thermostat has been increased and the room is now monitored to ensure the temperature is between 18°C and 22°C as required. (d) (1) The damaged cork tiles will be replaced