Regulation 29 in Cork

Premises: 53 non-compliance(s) in the latest reports we read.

An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

16 June 2026

Cherry Blossoms Kilbrin, Kilbrin · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was received from the registered provider: Corrective and Preventive Action A water heater has been installed

8 June 2026

First Steps Creche, Cork · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider ensured the flooring was repaired and will be reviewed regularly

27 May 2026

Julie Bee's Preschool, Innishannon · Regulation 29 — Premises

Provider's corrective action:
  • In her written response, the registered provider detailed how the damaged floor tiles had been replaced and new floor covering had been laid

26 May 2026

The Old School House, Knockraha Village · Regulation 29 — Premises

Provider's corrective action:
  • 1. All windows were cleaned to ensure cobwebs were removed. This will be monitored going forward. 2. The plug downstairs was repaired following the inspection. The manager will ensure to conduct regular checks of the premises going forward. 3. The radiator was fixed to the wall. The manager will ensure to conduct regular checks of the premises going forward. 4. A new skirting board was purchased and replaced in the Toddler dining room

1 April 2026

Curious Minds Rusheen, Rusheen · Regulation 29 — Premises

Provider's corrective action:
  • (c) The registered provider stated in their response that a painter had been booked prior to the inspection and has since attended. The ceiling and walls were cleaned, prepped and painted. This will be monitored and repainted as required. (d) • The radiator cover was securely fastened to the wall following the inspection. Ensuring the radiator cover is securely fastened has been added to the service’s daily checklist. • The skirting boards and walls were also cleaned, prepped and painted. These will be cleaned regularly and repainted as required

23 March 2026

Little Oaks Preschool, Kilworth · Regulation 29 — Premises

Provider's corrective action:
  • The following response was received from the registered provider: Corrective and Preventive Action (c) Additional heaters have been purchased and the room temperature will be monitored. The heaters and oil heating will be turned on early in the morning. (d) The items and areas listed have been cleaned and painted. Unclean toys, a mat and the metal tin have been removed. The hole has been repaired. Daily cleaning will be carried out and risk assessments to ensure damaged items are removed

3 March 2026

Ballyellis Childcare T/A Quality Childcare, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • 1. The person in charge ordered new ceiling tiles to replace the cracked and broken ceiling tiles. The ceiling tiles will be checked regularly going forward to avoid cracks and staining. 2. The person in charge organised for the plumber to come to the service to repair the flush mechanism on one of the toilets. The person in charge stated that all plumbing works will be reviewed regularly

25 February 2026

Wee Wisdom Pre-School, Fermoy · Regulation 29 — Premises

Provider's corrective action:
  • The following response was received from the registered provider: Corrective and Preventive Action 1. The water and heating had been turned off the night prior to inspection dure to new taps being installed. They have now been turned on and the heating has returned to normal. 2. The outdoors toys have been power washed and a new cleaning schedule is in place. The service plan to adhere to the cleaning schedule. 3. A new tap is ordered and the service is awaiting the plumber. The service will monitor all water temperatures and flow in the future

17 February 2026

Cherryblossoms Lismire, Newmarket · Regulation 29 — Premises

Provider's corrective action:
  • The following response was received from the registered provider: Corrective and Preventive Action The windows were cleaned immediately. A notice was put in place to remind staff to sign only when cleaning was completed. Windows are to be cleaned monthly

16 February 2026

Boherbue Educare Centre CLG, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The windows where the water was evidently leaking has been sealed and will be monitored. 2. The hand railing has been fixed

12 February 2026

Tiny Tots Creche & Pre-School, Killeagh · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The CAPA response stated that this skirting board has been cleaned and repainted. The sky light has also been painted. Going forward, staff will ensure that the sky light is not opened during bad weather, in order to help prevent the area from getting wet and causing black spots. 2. The malodour was no longer apparent when the toilets were flushed. Going forward, all toilets will be flushed before children enter the room. 3. The changing area has been cleaned and the vent has been taken down and cleaned. The registered provider spoke to the staff about making sure that all of the changing area is cleaned. The registered provider also directed staff to check the vents regularly, in order to ensure that they are clean. Going forward, the changing mat will be removed and the changing table will be cleaned and the mat will be cleaned in between nappy changes. The vents will be checked regularly, to ensure that they are clean

29 January 2026

Curious Minds, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider stated that the children’s sanitary area is cleaned daily and after use, as necessary. It has been arranged to have the sanitary area painted when the service is closed. Any areas that require to be repaired will be completed in the future

22 January 2026

Lios na nÓg, Cork · Regulation 29 — Premises

Provider's corrective action:
  • A plumber has been engaged to thermostatically control the water temperatures. A water temperature recording chart has been put in place to ensure that water temperatures are monitored daily

19 January 2026

Ringlee House Pre-School, Cobh · Regulation 29 — Premises

Provider's corrective action:
  • (c) The light in Room 1 has been replaced. (d) The toilet cubicle door in Room 3 has been fixed. The service will keep on top of maintenance. The registered provider had been waiting for assistance to have the light repaired and the hinge replaced

12 January 2026

Cherryblossoms Creche Kanturk, Kanturk · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was received from the registered provider: Corrective and Preventive Action The plumber inspected the concern and a new pump was put in place

8 January 2026

Naíonra Thomáis Dáibhís, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • The cistern has been fixed by building management. Regular checks will be completed by staff to ensure the sanitary facility is safely working

8 December 2025

Ready Steady Play, Cork · Regulation 29 — Premises

Provider's corrective action:
  • No response received

21 November 2025

Múin Preschool Carrigaline, Carrigaline · Regulation 29 — Premises

Provider's corrective action:
  • An electrician has installed a third radiator in the care room, which is larger than the other radiators. Staff will ensure that the window in the sanitary facility is kept closed during colder days. Going forward, staff will take daily air temperatures and if required, another radiator will be installed

18 November 2025

Early Starters Limited, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • The following response was received from the registered provider: Corrective and Preventive Action A wall mounted heater has been fitted in the bathroom out of reach of the children. Staff will ensure that the bathroom is maintained at a temperature between 18°C and 22°C. Funding is secured to build a new bathroom

13 November 2025

Churchtown Montessori School, Cloyne · Regulation 29 — Premises

Provider's corrective action:
  • (d) The ceiling tiles have been replaced. Any broken ceiling tiles will be replaced by the landlord. (e) The toilet has been repaired. As the building is old, repairs are sometimes required. A plumber will be contacted to fix any issue that may arise

6 November 2025

Mahon CDP Community Creche, Cork · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The written reply stated that the tap in the children’s toilet facility has been fixed and now provides running water. In order to ensure that this does not happen again, management will ensure that any broken equipment will be attended to immediately. 2. The broken tap at the staff wash hand basin has been fixed. The water pressure has been reduced and it is flowing as normal. To prevent this from reoccurring, all equipment will be fixed immediately by the service’s plumber

25 September 2025

Jack and Jill Childcare Centre Ltd, Midleton · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider purchased new bulbs for the light fixings in the main preschool room. This will be regularly checked by staff

17 September 2025

St Mary's Preschool Cobh, Cobh · Regulation 29 — Premises

Provider's corrective action:
  • The light has been replaced by the caretaker. This had been requested previously

28 July 2025

Cheeky Cherubs Early Years Schools - Bishopstown, Cork City · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action The registered providers stated in their response that the painter removed the peeling paint and followed on by painting the area. The maintenance man reapplied silicone around the sink to fill in any gaps which now ensures ease with cleaning the area. Preventive Action Each room has their own maintenance log sheet which staff are required to fill out when maintenance is required in the room

23 July 2025

Care-A-Lot Childcare Ltd, Upton · Regulation 29 — Premises

Provider's corrective action:
  • Corrective Action 1. The mechanical ventilation system vent was cleaned. 2. The nappy bin has been replaced. 3. Small flies have been removed from the area and there is no evidence of them in the room now. Preventive Action 1. Ensure that staff clean the vent regularly as part of the cleaning schedule. 2. Ensure the nappy bin is sealed to prevent foul smells. 3. Prevent small flies from entering. The door to the nappy changing room will be closed

15 July 2025

Cairde go Deo, Rathcormac · Regulation 29 — Premises

Provider's corrective action:
  • The person in charge purchased new bulbs and replaced the broken light in the hallway. The service has additional bulbs stored to rectify any lighting issues in future

15 July 2025

Shanakiel Childcare, Shanakiel · Regulation 29 — Premises

Provider's corrective action:
  • (e) 1. As per the corrective action stated under Regulation 23, in the adjoining premises, there are now five toilets and five wash basins solely allocated for the children’s use, as the adult toilet has been redesignated as the fifth children’s toilet. A new staff toilet facility has been fitted in the adjoining main building, to replace the toilet that is now designated for the children’s use. Going forward, a designated sleep room, which is no longer in use, will be converted to a second staff room/kitchen area. This will allow the service to convert the existing staff room/kitchen in the single storey premises, into additional sanitary facilities. This work is scheduled to take place during the October mid-term break. 2. The stopper has been removed from the wash basin in the staff toilet facility, located between Wobbler 1 and Wobbler 2. It was identified that the stopper was not releasing fully, which was restricting drainage and causing the water to pool. With the stopper now removed, the sink is draining adequately and functioning correctly. The plumber initially attempted to resolve the high pressure issue by reducing the water pressure locally at the affected sink. However, this did not fully resolve the problem. As a result, it was necessary to reduce the water pressure at the main source before the water enters the building. The plumber has advised that this adjustment may negatively impact water pressure in other areas of the building and could potentially lead to further issues. The service will continue to monitor the situation and will address any issues that arise

14 July 2025

Cherryblossoms Kiskeam, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was received from the registered provider: Corrective and Preventive Action (d) The internal roof was cleaned and painted, and the external roof was sealed. This area is now added to the monthly maintenance checklist

23 May 2025

ABC Academy, Fermoy · Regulation 29 — Premises

Provider's corrective action:
  • 1. The matting on the playground has been repaired with soft matting granules and sealant. The registered provider has committed to ensuring the matting on the playground will be monitored and maintained as required. 2. The registered provider has stated all taps have been repaired by himself and stated that they will be monitored by the staff daily to ensure they are working and have hot water. The registered provider has stated that they have not been added to the checklist as they are to be monitored by the staff in each care room

21 May 2025

Walterstown Community Playschool, Cobh · Regulation 29 — Premises

Provider's corrective action:
  • The accessible toilet has been designated for use by staff members and staff have been informed of same. The toilet facility formerly referred to as the staff toilet is now solely for the children’s use

19 May 2025

Gortroe Pre-School, Youghal · Regulation 29 — Premises

Provider's corrective action:
  • (c) 1. The CAPA response stated that the staff sanitary facility has been cleaned thoroughly and that the vent was opened and cleaned. In July 2025, the staff sanitary facility will be painted and the ventilation system will be thoroughly cleaned again. The hall committee will ensure that this is working correctly. In addition, the registered provider has arranged to meet with the committee to make plans for toilet facility renovations. (d) 2. The children’s sanitary facilities have been deep cleaned. Staff have advised that due to the window being open for ventilation, dust comes in from the outdoor play area, as the mud kitchen is located outside. The sanitary facilities will be deep cleaned every day, specifically where the dust enters. A notice has been placed on the wall in the sanitary accommodation to remind staff of this. The reply also stated that new skirting boards will be fitted in the children’s sanitary facilities, during the summer months, in order to prevent the wall from becoming damaged in the future

15 April 2025

Gate Childcare Ltd, Cork · Regulation 29 — Premises

Provider's corrective action:
  • In her written reply, the person in charge stated that the plastic slide and playhouse have been removed. A monthly risk assessment of the outdoor area will be undertaken, and staff are required to report and remove where possible, any damaged toys or equipment

12 March 2025

Ballygroman Day Care Centre, Ovens · Regulation 29 — Premises

Provider's corrective action:
  • The person in charge ensured that correct ventilation will be monitored in the sanitary facility and regular checks and cleaning checks will be maintained going forward

13 January 2025

Nurture Childcare and Early Learning Centre, Cork · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was made by the registered provider: Corrective and Preventive Action The service has now employed a cleaner

10 December 2024

Scamps and Rascals Pre-School, Ladysbridge · Regulation 29 — Premises

Provider's corrective action:
  • (c) The electrician has called to the service and has fixed the light. The electrician was also asked to check this issue thoroughly, to prevent it from reoccurring. The registered provider will do a daily check on all lights, to prevent this from happening in the future. (d) 1. The wall tiles have been fixed to the wall securely. Checks will be conducted to ensure that the wall tiles are secure. 2. The gap in the concrete has been covered safely. The registered provider will ensure that checks for gaps in concrete are carried out regularly

23 October 2024

Glanmire Childcare, Glanmire · Regulation 29 — Premises

Provider's corrective action:
  • (d) (1) The air vents in Pods 3 and 5 were cleaned. Air vents have been added to the cleaning schedules. (2) The cupboards under the sinks have been cleaned and these will be checked by management regularly

16 October 2024

Toddle Inn Montessori, Glamire · Regulation 29 — Premises

Provider's corrective action:
  • The response outlined that the service will no longer take work experience students and this will reduce the number of adults on the premises. From next September, the service will consider the number of children attending who require AIM support, as this is also having an impact on the number of staff required. Going forward, it will be ensured that no more than eight staff are on the premises at one time

11 October 2024

Anchor Playschool Meelin, Meelin · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was received from the registered provider: (d) (1) Arrangements have been made with maintenance personnel to replace the hot water tap in the care room

24 September 2024

Classes Childcare, Cork · Regulation 29 — Premises

Provider's corrective action:
  • The following statements were received from the manager; (d) (1) The plug plate was replaced in the Toddler care room. (2) The skirting boards and walls have been painted

16 September 2024

Lyre Community Pre-School Playgroup CLG, Banteer · Regulation 29 — Premises

Provider's corrective action:
  • (d) (1) The tile has been cleaned with appropriate materials and painted with anti-mould paint. Damaged tiles will be removed in the future

9 September 2024

Serendipity Montessori & Childcare Facility, Mallow · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was made by the registered provider; (e) (1) Custom made doors are being made due to the size of the area , when ready these will be fitted by the carpenter. Adults will supervise the toilets to ensure that only one child at a time is in the area until the doors have been installed

28 May 2024

Bright Beginnings, Drimoleague · Regulation 29 — Premises

Provider's corrective action:
  • (d) 1. The fence in poor repair has been taken down and the service is awaiting a new fence to be installed. This fence was separating the two designated play areas for the creche and playschool room. This fence was not part of the boundary securing the outdoor play area. Daily check of the outdoors including fences has been added to the service daily hazards check list. The fence will be replaced in due course and will be reviewed on the next inspection. 2. An easily cleanable surface has been placed on the wall behind the nappy changing unit and will be checked on a regular basis to ensure it is in a proper state of repair

13 May 2024

Tots to Teens Childcare Ltd., Carrig Na Bhfear · Regulation 29 — Premises

Provider's corrective action:
  • (d) The response stated that the mould growth adjacent to both windows in the Toddler room has been removed. The area has been painted and will be closely monitored to prevent reoccurrence. (e) The taps within both sanitary facilities have been replaced. Going forward, the service’s safety officer will ensure that all taps are working correctly and will replace any broken taps immediately

23 April 2024

Kilbrittain Montessori Pre-School, Kilbrittain · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider responded to state that they are negotiating with their landlord to install a second sink in the children’s sanitary area, meanwhile the service is using a second sink in the gents toilets with a partition from the urinals

15 April 2024

Ballycotton Montessori School, Ballycotton · Regulation 29 — Premises

Provider's corrective action:
  • The response received outlined that regular temperature checks will be carried out by staff and that the heating will be left on as needed, to sustain the appropriate temperature

15 April 2024

Generation Education, Midleton · Regulation 29 — Premises

Provider's corrective action:
  • • In the registered providers written response to the non-compliance she has stated that the toilet seat in poor repair in the children toilet for the children in the yellow room was removed and replaced with a new toilet seat

3 April 2024

Tinga Tinga Childcare, Midleton · Regulation 29 — Premises

Provider's corrective action:
  • 1. When the Inspector reviewed the refuse bins on the second day of the inspection, the bins in poor repair were removed and replaced with newly purchased lidded pedal operated bins in both the children’s toilets on the first floor. Corrected at time of inspection. 2. When the Inspector reviewed the toilet seat on the child size toilet in the Twiga Room on the second day of the inspection it was fixed in position on the toilet seat and no longer loose. Corrected at time of inspection

27 March 2024

Dreamers Creche Ltd T/A Little Angel's, Midleton · Regulation 29 — Premises

Provider's corrective action:
  • (c) In the written response the registered provider has stated that a new heating appliance was installed in the children’s toilets and nappy changing facility located beside Preschool Room 2. (d) 1. In the written response the registered provider has stated that the red couch in poor repair was removed and replaced with new soft seating purchased and now located by the book area in the Montessori room 2. When the Inspector reviewed the two refuse bins on the second day of the inspection, the bins in poor repair were removed and replaced with newly purchased lidded pedal operated bins located in the Montessori playroom and children’s toilets therefore the non-compliance was corrected at time of inspection. 3. When the Inspector reviewed the toilet seat on the child size toilet located beside the Montessori Room on the second day of the inspection, it was fixed in position on the toilet seat and no longer loose therefore it was corrected at time of inspection

27 March 2024

Tigers Childcare, Passage West · Regulation 29 — Premises

Provider's corrective action:
  • 1. The paintwork in the Senior Discoverer’s room, the Explorer’s room and the Junior Active care rooms has been assessed by 2 painters who are currently in the process of preparing paintwork quotations for the registered provider. The staff attached to the premises will continue to submit maintenance request forms to the services’ operations team when repairs need to be addressed. 2. The hole on an internal wall directly beside the nappy changing area attached to the Explorer’s room has been repaired. Maintenance request forms will be submitted to the services’ operations team when repairs need to be addressed

22 March 2024

Macroom Family Resource Centre Ltd, Macroom · Regulation 29 — Premises

Provider's corrective action:
  • In the written response, the following was stated by the childcare manager: Corrective and Preventive Action (d) 1. Shirting boards were placed over the areas where the floor covering joined the wall tiles in the two children’s toilets adjacent to the Tiger Room. 2. The timber door cupboards in poor repair were removed and replaced with new door cupboards located under the wash hand basins in the children toilet facility beside the Tiger Room

13 February 2024

Pathways Childcare Ltd., Douglas · Regulation 29 — Premises

Provider's corrective action:
  • (e) 1. The wall mounted dispenser was replenished with disposable paper towels for hygienic hand drying. 2. The person in charge submitted in her written response dated 29 February 2024 that the mal functioning electric paper dispensers were repaired since the inspection

23 January 2024

Watergrasshill Preschool and Afterschool Care, Watergrasshill · Regulation 29 — Premises

Provider's corrective action:
  • The following statement was received from the registered provider: (c) (1) Staff will ensure that the sanitary room temperature is maintained between 18°C - 22°C

7 November 2023

Rosscarbery Montessori School, Rosscarbery · Regulation 29 — Premises

Provider's corrective action:
  • & Supporting Documentation Submitted The registered provider stated that a builder has agreed to work on the disability bathroom to return it to a cubicle and to install a wash hand basin. A headed invoice from a building contractor was submitted to evidence that the remedial works are to be completed within the next few weeks. Summary Comment A document in the form of an invoice was submitted to the early years office; it was reviewed and found to adequately evidence that the non-compliance is to be addressed. This will be reviewed at the next inspection