Creche Inspection Reports

Regulation 29 in Donegal

Premises: 18 non-compliance(s) in the latest reports we read.

An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

20 May 2026

Letterkenny Community Playgroup Childcare Centre CLG, Letterkenny · Regulation 29 — Premises

Provider's corrective action:
  • (d) All walls have been washed, and visible marked walls have been covered over with pictures and white boards. Chipped walls will be painted before the new term. Management will do regular checks of the walls in each of the playrooms. (e) The service has arranged for works to put another nappy changing facility outside the baby room; this will be adjacent to the sink inside the baby room so the service can install a sink for handwashing. Currently the service has the requirement of 1:11 for nappy changing and hand hygiene (due to lower numbers attending for summer). The service will have an additional nappy changing facility ready in September 2026. Management will ensure that there are enough nappy changing facilities for the number of children in nappies attending

8 May 2026

Bee Kool Kidz Creche, Letterkenny · Regulation 29 — Premises

Provider's corrective action:
  • 1. Pink mats removed and replaced with new soft mats. Staff have been informed to report if mats are needing freshened or replaced. 2. Painter has been booked for Saturday 1st August leading into the bank holiday weekend to give all rooms a freshen up. 3. Faulty taps have been fixed and have adequate flow of running water. Staff have been encouraged to keep a close eye if children are pulling on taps and report any faults of any inadequate flow of water

10 April 2026

Kid Kare Créche & Montessori Pre-school, Donegal Town · Regulation 29 — Premises

Provider's corrective action:
  • 1. A new regulator has been installed for the sun room pipes. This will rectify the water pressure issue. Staff have been advised to contact the office if the water pressure issue returns

11 March 2026

Aurora's Hobbits Ltd, Killygordon · Regulation 29 — Premises

Provider's corrective action:
  • (1) A new radiator was purchased and installed to ensure the heat in our sleep room is within the regulated temperature management will ensure the team are carrying out their daily indoor checklists, their sleep checks and the health and safety of the children will remain paramount. (2) The sleep room was treated and repainted. Management will ensure the team are carrying out their daily indoor checklists and the health and safety of the children will remain paramount. (3) The sleep room was treated and repainted. Management will ensure the team are carrying out their daily indoor checklists and the health and safety of the children will remain paramount. (4) The sleep room was treated and repainted. Management will ensure the team are carrying out their daily indoor checklists and the health and safety of the children will remain paramount. (5) Cleaned the blocked trap and the washed the drains. Management will ensure the team are carrying out their daily indoor checklists and the health and safety of the children will remain paramount (6) The hole was filled and painted. Management will ensure the team are carrying out their daily indoor checklists and the health and safety of the children will remain paramount. (7) The Toddler yard was cleaned and decluttered. Management will ensure the team are carrying out their daily outdoor checklists and the health and safety of the children will remain paramount. (8) The service was cleaned daily following all our room checklists. Management will ensure the team are carrying out their daily cleaning checklists

11 March 2026

Dunfanaghy Community Playhouse Ltd, Dunfanaghy · Regulation 29 — Premises

Provider's corrective action:
  • A plumber was contacted and the service is awaiting the work being carried out

13 February 2026

Nursery Lane Playgroup Limited, Lifford · Regulation 29 — Premises

Provider's corrective action:
  • (d) The windowsills have been painted, and staff have been instructed to include such items in the maintenance checklist and notify the manager as necessary. Additionally, a painter has been scheduled to perform painting tasks during the Easter break

3 February 2026

Glen Outdoor, Letterkenny · Regulation 29 — Premises

Provider's corrective action:
  • In a written response the registered provider stated: (c) Temporary heating measures were put in place immediately, including portable heaters where safe and appropriate, to ensure staff and children remained warm. The central heating system and boiler are being fully inspected and repaired to ensure consistent heating throughout the service. Heck lists have been out in place to ensure the morning staff checks the system. The central heating system and all radiators will continue to be regularly serviced and maintained to prevent recurrence of heating issues. (d) The entire teepee was power-washed to remove algae, dirt, dust, and cobwebs

2 December 2025

Little Acorns Playgroup (Raphoe), Donegal · Regulation 29 — Premises

Provider's corrective action:
  • The heating system is now timed to ensure the rooms are warm and within the required temperatures when the children arrive. Two wall thermometers have been purchased and secured to the walls to allow for visual checks of the room temperature by staff

11 November 2025

First Steps Playgroup, Letterkenny · Regulation 29 — Premises

Provider's corrective action:
  • 1. The blind has been cleaned. 2. The leak has been fixed

6 November 2025

Bizzy Bees Creche, Clonmany · Regulation 29 — Premises

Provider's corrective action:
  • Arranged with contractor for works over Christmas to mend the mechanical ventilation. The landlord was contacted to fix the pane of glass. The toilet roll holders were ordered the next day and arrived the following Monday. Do premises check more often

21 October 2025

LMNO Childcare, Letterkenny · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider responded: The painters have been booked and are work is due to take place over the Christmas break. The manager will continue to arrange repainting of the room every year or as needed

2 September 2025

Barnesmore Montessori School, Barnesmore · Regulation 29 — Premises

Provider's corrective action:
  • 1. The blinds have been adequately cleaned, and the window seal has been removed. The mould grew over 2 months as the service was closed. Ventilation to the room has been increased and a dehumidifier is in use over the weekends

8 July 2025

Ardara Community Childcare Ltd, Ardara · Regulation 29 — Premises

Provider's corrective action:
  • Checks are carried out annually by our engineer and action is taken on her guidance with any safety and maintenance issues in relation to the defective blockwork. All cracks are filled as soon as they appear, the manager and deputy manager have taken note of each crack as it appears

12 June 2025

Naíonra Ailt a'Chorráin, Leitir Ceanainn · Regulation 29 — Premises

Provider's corrective action:
  • (c) The service has followed up with the contractor to see how much longer it would take to complete the ventilation works in the bathroom. The area was observed on the 16th of May it was confirmed that the works will be done before next Friday the 4th of July

4 June 2025

Milford Community Playgroup Ltd, Milford · Regulation 29 — Premises

Provider's corrective action:
  • Toilet facilities are now provided in the adjoining building, with landlord approval for adult sanitary use

1 April 2025

Learn and Play Preschool Letterkenny CDP, Letterkenny · Regulation 29 — Premises

Provider's corrective action:
  • (a) (d) The landlord has been informed of the ongoing issue. The management of the CDP will conduct a review of the premises. The landlord has verbally committed to carry out repairs of the building whilst closed during the summer. CDP management will meet to discuss a long term strategy for the preschool

5 March 2025

Rosie and Jim's Playschool, Castlefin · Regulation 29 — Premises

Provider's corrective action:
  • The registered provider has stated the following. Corrective and Preventive Action I have looked at various suitable changing units that are suitable for the space I have in the disabled toilet and that can support older children of a heavier weight. The units are too big for the space that I would like to purchase, therefore I have contacted someone to tailor make a changing station. Please see email regarding this before I proceed to ensure that this unit is maintained and suitable for use

24 July 2024

Slí an Eolais, Dungloe · Regulation 29 — Premises

Provider's corrective action:
  • A new nappy changing unit has been ordered. Sufficient nappy changing units will be in place

Regulation 29 in other counties