Inspection of 12 June 2025 — Inspection Report
Regulation 29 — Premises
- (c) There was no ventilation, either natural or mechanical, in the children’s sanitary accommodation. This was found to be non-complaint on the previous inspection. It is acknowledged that the works had been scheduled to take place over the Easter holidays, and the inspector was informed that this was postponed to the summer holidays at the request of the contractors
Provider's corrective action:
- (c) The service has followed up with the contractor to see how much longer it would take to complete the ventilation works in the bathroom. The area was observed on the 16th of May it was confirmed that the works will be done before next Friday the 4th of July
Found compliant: Regulation 9, 11, 15, 19, 24, 27.