Creche Inspection Reports

Regulation 26 in Limerick

Fire safety measures: 13 non-compliance(s) in the latest reports we read.

An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

30 June 2026

All About Kids Ltd, Doon · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated in the CAPA form that:
  • The fire/smoke alarms was serviced on Monday 13th of July and a certificate of completion was provided. The updated certification is now on file in the service to ensure ongoing compliance with fire safety requirements. A monitoring system has been put in place to track the expiry date of all required safety certificates. Fire alarm and smoke alarms servicing will be scheduled well in advance of the renewal date, with reminders entered into the service calendar

29 May 2026

Rainbows End Montessori School, Ballykeefe · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The smoke alarm system was serviced on the 7th of July 2026. A reminder has been inputted in the diary for the annual servicing of the smoke alarm system and the fire fighting equipment

6 May 2026

Tineteriffe Preschool, Cappamore · Regulation 26 — Fire safety measures

Provider's corrective action:
  • (40 The fire procedure is displayed on the wall for all children and adults to see

13 November 2025

Next Step Playschool, Croom · Regulation 26 — Fire safety measures

Provider's corrective action:
  • Following the inspection of the service a maintenance check of the fire alarm system in the Preschool took place in November. Future maintenance checks of the system were booked and organised to take place twice yearly

5 November 2025

Castle Kids Creche, Kilmallock · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated that:
  • Fire drills were practised on the 6th of November the day after the inspection and the 4th of December 2025
  • The fire notice setting out the procedure to follow in the event of a fire was displayed in a conspicuous area of the service

14 October 2025

Hospital Community Preschool Playgroup Ltd, Limerick · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated in the CAPA response that:
  • (b)The smoke alarm system was serviced on the 24 th of October 2025. The service will ensure that the smoke alarm system will be serviced on an annual basis

16 June 2025

Clever Cats Preschool, Limerick · Regulation 26 — Fire safety measures

Provider's corrective action:
  • (1)(a) Following the inspection, fire drills recommenced on a monthly basis. A record book is now in place to record all monthly fire drills

10 June 2025

Miles of Smiles Preschool, Newcastle West · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated the following: (1)(a) Fire drill will be practised on a monthly basis and will be included in the monthly compliance tracker. The service will document each fire drill in the fire safety file and a head count before and after each drill will be included. (b)The smoke alarm was immediately serviced on the 13th of June 2025. The fire drills and the smoke alarm system will be on a monthly/yearly compliance tracker to ensure this will not reoccur in the future

5 June 2025

Elmwood Community Pre School, Loughill · Regulation 26 — Fire safety measures

Provider's corrective action:
  • The registered provider has stated that: A fire drill took place on the 16th of June 2025. Fire drills will be conducted monthly in Elmwood Preschool. The updated ‘Fire Drill Log’ is displayed and the service plans to review and update the policies/logs more frequently

4 June 2025

Butterfly Preschool Kilmeedy, Kilmeedy · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated that: (1)(a) A fire drill was carried out on the 5th of June, the day after the inspection by the staff and children. Fire drills will be practiced by staff and children each month

4 April 2025

Stepping Stones Pre School, Bruree · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The person in charge stated in CAPA 1 document that: (1)(b) The smoke alarm was serviced on the 17th of April 2025. Annual testing and review will be carried out by a designated electrical contractor

29 January 2025

Tree Top Pre School, Kilbehenny · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated the following: (1)(a) Fire drills have commenced and the most recent was dated the 19th of February 2025. (b) The smoke alarm system was serviced on the 18th of Feb 2025. Reminder are in place to ensure fire drills are practised each month and the firefighting equipment including the smoke alarm system are service yearly

21 March 2024

Cute & Clever Playschool, Lisnagry · Regulation 26 — Fire safety measures

Provider's corrective action:
  • : The registered provider has stated in the action and preventative form that the following measures were taken:
  • A monthly fire drill on the 11th of April 2024 was carried out. The service will continue to practice monthly fire drills and will maintain a written record of all the fire drills that take place in the service. These monthly fire drills will be logged and displayed. (b) The firefighting equipment was serviced on the 10/04/2024 and an electrical contractor checked and tested the Fire Detection Smoke Alarm System on the 12/04/2024

Regulation 26 in other counties