Creche Inspection Reports

Regulation 23 in Longford

Safeguarding Health, Safety and Welfare of Child: 13 non-compliance(s) in the latest reports we read.

An inspection records what inspectors saw on one day; services respond with corrective actions — how to read this.

25 May 2026

ABC Minard, Longford · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. Corrective action received and accepted for IAN 1708 served. 2. The Garda Vetting disclosure was received. A new check system for Garda Vetting renewals has been introduced. 3. The slides have been repaired and are very stable. A maintenance and safety checklist is now in place to check equipment. Infection Control: 4. We have gone through the nappy changing policies with all staff. We have asked all staff to complete a nappy change with the manager observing. Nappy changing will be spot checked on random days and at random times by the manager to ensure that the nappy changing is being completed correctly. 5. All babies wash their hands now with soap and water. 6. A new steam steriliser has been purchased, and staff will use it at the end of each day to sterilise the children’s soothers

10 March 2026

StepByStep, Killoe · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. The Garda vetting renewal documents are now on file. There is a tracking system on the service App. Reminders will be sent to staff to complete Garda Vetting links within the required timeframe going forward. Infection Control: 2. Nappy changing procedures have been reviewed with all staff. Ongoing supervision and regular checks will be carried out to ensure practice is consistently maintained. Administration of Medication: 3. Where any child has a diagnosis of allergies, etc an up -to-date health care plan will be in place and regularly reviewed to ensure compliance . Parents will be reminded to ensure the service is updated with relevant information as required

4 February 2026

Winnie the Pooh Montessori, Drumlish · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. The car insurance company was contacted, and the policy was updated to business use class insurance . The manager will review all insurance policies at the time of renewal to ensure the correct cover for business class is obtained for both vehicles

12 January 2026

Dromard Childcare Community Group CLG, Moyne · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: Garda vetting was applied for immediately and completed. A written record of vetting dates for each staff member will be kept in the staff folder as a clear reminder when vetting is due for renewal to ensure Garda Vetting is completed in future in a timely manner to ensure compliance is maintained

8 December 2025

Whizzkids Drumlish Community Childcare CLG, Drumlish · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. A new high fence has been erected with a blot locking system so that no unauthorised entry is possible at any time. Management and staff do daily checks to ensure that there is no unauthorised entry at any time, and the daily Management Risk assessment is completed daily. 2. A new Indoor and Outdoor risk assessment policy has been developed. Management will do daily check of both indoors and outdoors and this is signed off by Management daily. Infection Control: 3. The shared toys are put into a container during the day and taken in the evening by a staff member to be sterilised and washed and brought back to the room the following morning. Each child has a separate container for their soothers, and they are also sterilised and washed by a member of staff when required daily. 4. We discussed with staff and we put a more step by step procedure in place

17 November 2025

Catkins Early Years Service, Longford Town · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. The Garda Vetting disclosure is on file. 2. The Centre Manager went through the forms, requirements and how to submit. All rooms now submitting their assessments daily via the Little Vista App. Centre Manager sent a reminder message on little vista. The task has been delegated by Lead Educators with an alternative person delegated in the case of absence. 3. Two sets of new chairs purchased, 15cm chairs & 20cm chairs. This will ensure we have height appropriate chairs for the smallest children attending regardless of height. Lead Educators know now to check their feet touch the floor. Infection Control: 4. The beds were removed and are now stored in a storage press beside the room. Safe Sleep: 5. Floor beds have been purchased for the children aged under 2 years who do not sleep in a cot. 6. Sleep Plans are completed as per Tusla Sleep Guidelines. The Lead Educator trained in the sleep guidelines to ensure the forms are completed in the future. The sleep plan requirement now included in the full policies and procedures for the service. 7. A new mattress has been purchased . All mattresses are labelled to match with the corresponding cot so the long cot doesn’t end up with a short mattress again after they are stripped for cleaning

10 November 2025

St. Marys Childcare Campus CLG, Edgeworthstown · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. Replacement locks on the gates with a combination lock to open have been fitted to the gates. The locks will be checked as part of the risk assessment to ensure that they are operating correctly. 2. The daily risk assessments are now recorded on the electronic record system. The Manager/person in charge completes a manager’s daily risk assessment on the electronic record system. Infection Control: 3. The new staff members are asked to read thoroughly the nappy changing policy and sign to say they have read and agree to adhere to the nappy changing/pull up and toileting policy of St. Mary’s Childcare campus . The room leaders will ensure that all staff are adhering to the correct steps. This is included in new staff induction training

23 September 2025

Little Angels, Longford · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: The hot water tank thermometer was reset. A separate water heater is in place for the kitchen sink to ensure hot enough water for the washing dishes etc. The thermostat will be checked on a regular basis to ensure it is maintaining the correct temperature. Infection Control: Corrective Action: Nappy changing procedure was updated to state when the gloves and aprons are to be removed which was signed off by all staff that change nappies. A practical demonstration was carried out with staff that change nappies. Preventive Action: Regular checks on nappy changing will be carried out by management every couple of months. Safe Sleep: Corrective Action: A floor bed has been ordered. Preventive Action: Standard cots will be used for sleeping children under 2 years. Fire Safety: Corrective Action: The fire assembly sign was put back up at the back of the garden Preventive Action: We will ensure this fire assembly sign will remain in place at all times in line with fire safety regulations

22 September 2025

Scallywags, Longford · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. The risk assessment policy now in place as well as daily risk checklist for each room and outdoor areas . Management will ensure risk assessments are carried out for each room and outdoor area everyday Fire Safety: 2. The fire equipment has been serviced in October 2025

15 September 2025

ABC Childcare Stonepark, Longford · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. A frosting film has been placed on the door , and the curtains have been removed. T he curtains have been removed from the conservatory area. This has been added to the room risk assessment. 2. The door lock has been replaced. Checking door handles and locks is added to the room risk assessment. 3. Some of the electrical devices have been moved to another area. Ensuring sockets are not overloaded with electrical appliances has been added to the risk assessment sheet. 4. The air freshener has been removed from the area. The risk assessment has been updated to ensure there are no items left within a child’s reach in the sleep room. 5. A new mattress has been bought for the cot to ensure it fits snuggly in the cot. The risk assessment has been updated to ensure cots and mattresses are checked to ensure that mattresses are the correct size for the cots. 6. The thermostat was adjusted to bring down the water temperature to an appropriate level. As part of the daily cleaning, staff will check and document the water temperature and highlight to management if it needs to be adjusted. 7. A new toilet seat has been put on the toilet. The toilet risk assessment has been updated to check that toilet seats are secured. 8. The risk assessments have been updated to ensure the general safety risks identified during inspection does not reoccur in the future. The risk assessments will be updated annually or when any changes have been made to an area if this is sooner. Infection Control: 9. All paper towels have been placed in dispensers. A staff member has been assigned the responsibility to ensure all toilet rolls and paper towels are placed directly into the dispensers and check daily to see if they need replacing. This is now part of the daily risk assessment check. 10. All toilet rolls have been put into the toilet roll dispensers. A staff member has been assigned the responsibility to ensure all toilet rolls and paper towels are placed directly into the dispensers and check daily to see if they need replacing. This has been added to the daily risk assessment/cleaning sheet. 11. The toilet seat has been removed. The toilet cleaning chart has been updated to ensure any equipment not fit for purpose has been discarded. 12. Staff have received inhouse training on nappy changing and were reviewed carrying out nappy changing to ensure they followed all steps on our nappy policy procedure . Inhouse nappy changing training will form part of our team meetings to ensure all staff are kept very familiar with all steps. Our nappy changing policy is displayed in the nappy changing area to remind staff of the step-by-step procedure that they must follow

28 July 2025

ABC Childcare Drumlish, Drumlish · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • General Safety: 1. All doors were locked immediately, and we are ensuring they are locked every day . A MS teams meeting with held with all staff to remind them of the importance of keeping the entrance doors locked. 2. All doors were locked immediately, and we are ensuring they are locked every day. A MS teams meeting with held with all staff to remind them of the importance of keeping the entrance doors locked. 3. The cleaning sheet has been updated to include a risk assessment . The indoor and outdoor maintenance risk assessment is completed by the caretaker weekly. The updated sheet has a space for staff to document a ny risks/hazards that they identify. 4. The cord blind was replaced on the blind with a new cord and secured. 5. Visibility strips have been added to the window in the form of a window art decoration. Infection Control: 6. The nappy changing policy has been updated and shared this with all staff. All staff have been re -trained in nappy changing practice. 7. The bed sheets are stored in individual storage boxes with each child’s names on them and beds are dressed as they need before children go to sleep. 8. Disposable wipes have been replaced with individual face cloths for each child. Retraining has been competed with the staff on the importance of proper effective handwashing. The practice will be monitored by room leaders and the centre manager. Safe Sleep: 9. All cots were checked and are fitted with snugly fitting mattresses. A new cleaning/risk assessment was created for the sleep room to prompt staff to check mattresses. 10. The foldable cot has been replaced with a regular cot and a snug fitting mattress with a recognised safety label attached. 11. The sleep room was reviewed, and the cots have been re-arranged in the room. 12. Plug in air fresheners are not used in the centre. A new cleaning/risk assessment was created for the sleep room to prompt staff to check all plugs have safety covers on them and to ensure that there is nothing plugged in within children’s reach. 13. The storage units were removed following the sleep room review. 14. The risk assessment has been updated. 15. The mould has been cleaned, and the ceiling was repainted. Fire Safety: 16. All items were removed to ensure the fire exit is clear. A new cleaning/risk assessment was created for the sleep room to prompt staff to check that the fire exit is kept clear at all times. 17. The fire assembly sign was changed to the opposite side of the garden and is now securely fixed. The sign is larger and more visible

16 June 2025

Club Ardagh CLG, Ardagh · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • Infection Control: 1. From date of inspection all perishable items were placed in the fridge provided. From September, all perishable items in children’s lunch boxes will be placed in the fridge. New signage prompts have been placed in the cloakroom and classroom to remind staff and children to place lunches in the fridge

5 March 2025

Longford Montessori Centre, Longford · Regulation 23 — Safeguarding health, safety and welfare of child

Provider's corrective action:
  • Infection Control: 1. The paper hand towels are in a dispenser

Regulation 23 in other counties