# Rainbows Pre-school Playgroup Ltd, Glenbeigh — inspection reports and findings

> Rainbows Pre-school Playgroup Ltd (Glenbeigh, Co. Kerry): what Tusla inspections found — 1 published inspection(s), non-compliances and the provider's corrective actions.

## Rainbows Pre-school Playgroup Ltd

Sessional · 2 - 6 Years · Glenbeigh, Kerry · Tusla ID **TU2015KY107** · Registered since 1 January 2026

An inspection records what inspectors saw **on one day**; services respond with corrective actions — [how to read this](/methodology.md).

#### Inspection of 23 October 2025 — Inspection Report

Full report (PDF, Tusla)

##### Regulation 19 — Health, welfare and development of child

- General Safety: 1. Garda vetting disclosures had been obtained for the 5 adults attached to the service. However, 1 vetting disclosure was not within the previous three years in adherence with the Early Years Inspectorate Regulatory Notice ‘EY-RN12.3 Renewal of Garda Vetting’

- The renewal Garda vetting application was submitted. A list of re-application dates for each employee’s Garda vetting renewal is snow posted on the cover of the staff folder as a reminder that renewals must be completed every 3 years

##### Regulation 29 — Premises

- (c) 1. There was black staining on the walls in the children’s toilets. (d) 2. The timber roof on the low-level playhouse in the designated outdoor play area was not completely intact. The person in charge informed the inspector the service had planned to replace the said roof. (e) 3. There was 1 of the children’s toilets that had no toilet seat

- The black mark has been removed by a professional cleaning product, primed with mould prevention and re- painted. The blocked shutters have been cleared and the loose felt on the side of the shed had been repaired which we believe caused the dampness. A monthly check will be added to the cleaning schedule. An industrial dehumidifier provided by the community handball hall will be used 1-2 times each month as a precaution. Daily ventilation will be provided. (d) 2.The damaged section of the roof on the outdoor playhouse has been removed, repaired and the edges have been sealed. The edges of the roof have been sealed and covered to prevent any future spread of dry rot. The playground has been added to the maintenance checklist, treatments or repairs will be carried out as necessary. (e) 3.The toilet seat has been re-attached

Found compliant: Regulation 9, 11, 25.

### Other services in Kerry

- [Scallywags Pre-school](/creche/scallywags-pre-school-killarney.md) Killarney
- [Scamps & Scholars Childcare](/creche/scamps-scholars-childcare-killorglin.md) Killorglin
- [Sheilann's Early Learning Centre](/creche/sheilann-s-early-learning-centre-gneeveguila.md) Gneeveguila
- [Stepping Stones Childcare & Pre-School](/creche/stepping-stones-childcare-pre-school-tralee.md) Tralee
- [Tus Nua Montessori](/creche/tus-nua-montessori-ballyduff.md) Ballyduff
- [Camp Community Childcare CLG](/creche/camp-community-childcare-clg-tralee.md) Tralee
- [Little Stars Pre-school](/creche/little-stars-pre-school-tralee.md) Tralee
- [Danú Childcare](/creche/danu-childcare-killarney.md) Killarney
- [Pebbles Montessori Pre-school](/creche/pebbles-montessori-pre-school-ballyheigue.md) Ballyheigue
- [Oakview Village Childcare](/creche/oakview-village-childcare-tralee.md) Tralee

[Alert me when a new report is published](/help.md) · [Dated report on this service — €19](/report.md)

---

Página: https://creche-inspection-reports.pages.dev/creche/rainbows-pre-school-playgroup-ltd-glenbeigh/
Fonte: Tusla Early Years Inspectorate
Recolha: 2026-09-11
