# Grian na nÓg, Dublin 24 — inspection reports and findings

> Grian na nÓg (Dublin 24, Co. Dublin): what Tusla inspections found — 1 published inspection(s), non-compliances and the provider's corrective actions.

## Grian na nÓg

Sessional · 1 - 6 Years · Dublin 24, Dublin · Tusla ID **TU2015DS005** · Registered since 1 January 2026

An inspection records what inspectors saw **on one day**; services respond with corrective actions — [how to read this](/methodology.md).

#### Inspection of 5 August 2025 — Inspection Report

Full report (PDF, Tusla)

##### Regulation 9 — Management and recruitment

- (2)(a) & (b) References had not been sourced for one adult who was employed on a temporary basis. This regulation was non-compliant on the previous inspection dated 17 April 2023. The adult had been recruited after this date. The actions which had been submitted following that inspection had not prevented the non-compliance from recurring. (3) The procedures specified in regulation 9(2)(a) and (b) had not been carried out prior to employment of one adult as outlined above

- (2)(a) & (b) & (3) Two valid references have been received and two reference checks completed. All future staff will be required to provide at least two references, including one from a previous employer, as part of the initial hiring process. An employee documentation checklist is in place which will be completed prior to the new staff member commencing employment

##### Regulation 23 — Safeguarding health, safety and welfare of child

- General Safety: Garda vetting was available for all staff. However, the vetting disclosure for one staff member was not dated within the previous three years in adherence to with the Early Years Inspectorate Regulatory Notice ‘EYI-RN12.3 Renewal of Garda Vetting’. Action submitted by the Registered Provider

- General Safety: The Garda vetting renewal for the staff member has been completed and filed. Scheduled emails have been created to send a notification to both managers when each individual Garda vetting is due for renewal. As a secondary measure all Garda vetting renewal dates have been scheduled in the calendar giving a notification four weeks prior to the Garda vetting expiring

Found compliant: Regulation 11, 19, 25, 26, 27.

### Other services in Dublin

- [Griffeen Valley Childcare](/creche/griffeen-valley-childcare-lucan.md) Lucan
- [Griffith Community Playgroup](/creche/griffith-community-playgroup-dublin-11.md) Dublin 11
- [Happy Days Creche](/creche/happy-days-creche-dublin-12.md) Dublin 12
- [Happy Friends Playgroup](/creche/happy-friends-playgroup-dublin-24.md) Dublin 24
- [Hedley Park Montessori School](/creche/hedley-park-montessori-school-dublin-2.md) Dublin 2
- [Hyde & Seek Childcare (Tolka Road)](/creche/hyde-seek-childcare-tolka-road-dublin-3.md) Dublin 3
- [Kids Inc St Louis JNS](/creche/kids-inc-st-louis-jns-dublin-6.md) Dublin 6
- [Little Gems Childcare](/creche/little-gems-childcare-dublin-22.md) Dublin 22
- [Oakview Village Tallaght](/creche/oakview-village-tallaght-dublin-24.md) Dublin 24
- [Willow Tree Afterschool](/creche/willow-tree-afterschool-dublin-15.md) Dublin 15

[Alert me when a new report is published](/help.md) · [Dated report on this service — €19](/report.md)

---

Página: https://creche-inspection-reports.pages.dev/creche/grian-na-nog-dublin-24/
Fonte: Tusla Early Years Inspectorate
Recolha: 2026-09-11
